A collaborative tool and approach for the hazard analysis and risk assessment process at TMT International Observatory

被引:0
作者
Hardie, Kayla [1 ]
Anderson, Robert [1 ]
Johnson, James [1 ]
Kinoshita, Kyle [1 ]
Miles, John [1 ]
Rogers, John [1 ]
Sadjadpour, Amir [1 ]
Trancho, Gelys [1 ]
Sugimoto, Masahiro [2 ]
Saito, Masao [2 ]
Inatani, Junji [2 ]
Saruta, Yusuke [3 ]
机构
[1] TMT Int Observ, 100 West Walnut St,Suite 300, Pasadena, CA 91124 USA
[2] Natl Astron Observ Japan, 2-21-1 Osawa, Mitaka, Tokyo 1818588, Japan
[3] Mitsubishi Electr Corp, Elect & Commun Syst Ctr, 8-1-1 Tsukaguchi Honmachi, Amagasaki, Hyogo 6618661, Japan
来源
MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY XI, PT 1 | 2024年 / 13099卷
基金
美国国家科学基金会;
关键词
Systems Engineering; Hazard Analysis and Risk Assessment; Safety; Process; Tools;
D O I
10.1117/12.3019071
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
Hazard Analysis and Risk Assessment (HARA) is a critical systems engineering and safety activity used to ensure a safe environment for personnel and hardware. At TIO we tailored the Atlassian Jira tool and third-party app SoftComply Risk Manager to provide a collaborative environment with subsystem teams in order to develop a comprehensive HARA process, starting with hazard identification and assessment and continuing through reassessment after mitigation. The paper shows how the tool was initially created for the Telescope Structure (STR) team to facilitate collaboration with the National Astronomical Observatory of Japan (NAOJ) and Mitsubishi Electric Corporation (MELCO) and has since expanded to all other subsystems as well as to the system-level, capturing intersystem hazards. From the system and subsystem HARAs, risk reduction actions are identified and if safety functions are used as a mitigation, they are described in terms of functional safety actions and associated SIL ratings. This overall HARA process provides TIO with a comprehensive overview of all Observatory hazards and the status of the development and implementation of their mitigations thanks to the Jira and Risk Manager dashboards, risk matrix, and risk table views.
引用
收藏
页数:10
相关论文
共 8 条
[1]  
Anderson R., 2021, TIO Environmental, Health, and Safety (ES&H) Plan (TIO.PMO.MGT.10.002)
[2]  
Anderson R., 2021, TIO Environmental, Safety, and Health Hazard/Risk Assessment Processes and Guidelines (TIO.PMO.MGT.10.004)
[3]  
atlassian, Atlassian JIRA software
[4]  
atlassian, SoftComply Risk Manager
[5]  
Hardie K., Proc. SPIE 2024: Modeling, Systems Engineering, and Project Management for Astronomy XI
[6]  
International Electrotechnical Commission, 2005, IEC 62061: Safety of machinery-Functional safety of safetyrelated electrical, electronic and programmable electronic control systems
[7]  
Johnson J., 2018, Functional Safety Management Plan, (TIO.CTR.SPE.17.001)
[8]  
Trancho G., 2020, TIO Systems Engineering Management Plan (SEMP, TIO.SEN.MGT.15.067)