共 13 条
- [1] The Research and Application of Dam Construction Technology of Rock-Filled Concrete CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1347 - 1350
- [2] Simulation of the working behavior of Shibahe reservoir rock-filled concrete gravity dam during construction Qinghua Daxue Xuebao/Journal of Tsinghua University, 2022, 62 (09): : 1408 - 1416
- [4] A Brief Review of Rock-Filled Concrete Dams and Prospects for Next-Generation Concrete Dam Construction Technology ENGINEERING, 2024, 32 : 99 - 105
- [5] Experimental study on heterogeneous temperature distribution of rock-filled concrete before and after casting Qinghua Daxue Xuebao/Journal of Tsinghua University, 2022, 62 (09): : 1388 - 1400
- [7] Safety evaluation of rock-filled concrete gravity dam with long section during the impoundment operation period Qinghua Daxue Xuebao/Journal of Tsinghua University, 2022, 62 (09): : 1375 - 1387
- [8] Numerical analysis on the characteristics of settlement deformation of the high rock-filled embankment during the construction period FUNCTIONAL MATERIALS AND NANOTECHNOLOGY, 2012, 496 : 374 - +
- [9] INTEGRATED EVALUATION OF COST, SCHEDULE AND EMISSION PERFORMANCE ON ROCK-FILLED CONCRETE DAM CONSTRUCTION OPERATION USING DISCRETE EVENT SIMULATION 2013 WINTER SIMULATION CONFERENCE (WSC), 2013, : 3109 - +
- [10] Effect of Temperature and Creep on Roller Compacted Concrete Dam During the Construction Stages CMES-COMPUTER MODELING IN ENGINEERING & SCIENCES, 2010, 68 (03): : 239 - 268