Bi-Objective Integrated Scheduling of Job Shop Problems and Material Handling Robots with Setup Time

被引:0
|
作者
Liu, Runze [1 ,2 ]
Jia, Qi [1 ,2 ]
Yu, Hui [1 ,2 ]
Gao, Kaizhou [1 ,2 ]
Fu, Yaping [3 ]
Yin, Li [1 ,2 ]
机构
[1] Macau Univ Sci & Technol, Macau Inst Syst Engn, Macau 999078, Peoples R China
[2] Macau Univ Sci & Technol, Zhuhai MUST Sci & Technol Res Inst, Zhuhai 519031, Peoples R China
[3] Qingdao Univ, Sch Business, Qingdao 266071, Peoples R China
基金
中国国家自然科学基金;
关键词
job shop scheduling; material handling robot; multi-objective optimization; reinforcement learning; meta-heuristics; GENETIC ALGORITHM; SEARCH ALGORITHM; OPTIMIZATION ALGORITHM; LOCAL-SEARCH; MACHINES; AGV;
D O I
10.3390/math13030447
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
This work investigates the bi-objective integrated scheduling of job shop problems and material handling robots with setup time. The objective is to minimize the maximum completion time and the mean of earliness and tardiness simultaneously. First, a mathematical model is established to describe the problems. Then, different meta-heuristics and their variants are developed to solve the problems, including genetic algorithms, particle swarm optimization, and artificial bee colonies. To improve the performance of algorithms, seven local search operators are proposed. Moreover, two reinforcement learning algorithms, Q-learning and SARSA, are designed to help the algorithm select appropriate local search operators during iterations, further improving the convergence of algorithms. Finally, based on 82 benchmark cases with different scales, the effectiveness of the suggested algorithms is evaluated by comprehensive numerical experiments. The experimental results and discussions show that the genetic algorithm with SARSA is more competitive than its peers.
引用
收藏
页数:32
相关论文
共 50 条
  • [41] Bi-objective mathematical model and improved algorithm for optimisation of welding shop scheduling problem
    Rao, Yunqing
    Meng, Ronghua
    Zha, Jing
    Xu, Xiaofei
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (09) : 2767 - 2783
  • [42] A Hybrid Nested Partitions Method for Bi-objective Job Shop Scheduling Problem Considering Energy Consumption and Makespan
    Dai, Mei
    Li, Xin
    Mao, Limin
    ADVANCED MANUFACTURING AND AUTOMATION VII, 2018, 451 : 563 - 571
  • [43] Simulation and experimental design methods for job shop scheduling with material handling: a survey
    Xie, Chen
    Allen, Theodore T.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 80 (1-4): : 233 - 243
  • [44] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Carman K. M. Lee
    Danping Lin
    William Ho
    Zhang Wu
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1105 - 1113
  • [45] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Lee, Carman K. M.
    Lin, Danping
    Ho, William
    Wu, Zhang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1105 - 1113
  • [46] Survey of integrated flexible job shop scheduling problems
    Li, Xixing
    Guo, Xing
    Tang, Hongtao
    Wu, Rui
    Wang, Lei
    Pang, Shibao
    Liu, Zhengchao
    Xu, Wenxiang
    Li, Xin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 174
  • [47] A shuffled frog-leaping algorithm with memeplex quality for bi-objective distributed scheduling in hybrid flow shop
    Cai, Jingcao
    Lei, Deming
    Li, Ming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (18) : 5404 - 5421
  • [48] Security based bi-objective flow shop scheduling model and its hybrid genetic algorithm
    Qing-Dao-er-Ji, Ren
    Wang, Yuping
    APPLIED MATHEMATICS AND COMPUTATION, 2014, 243 : 637 - 643
  • [49] Bi-objective dynamic multiprocessor open shop scheduling for maintenance and healthcare diagnostics
    Abdelmaguid, Tamer F.
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 186
  • [50] Modelling and optimization of a bi-objective flow shop scheduling with diverse maintenance requirements
    Seif, Javad
    Yu, Andrew Junfang
    Rahmanniyay, Fahimeh
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (09) : 3204 - 3225