Developing kinaesthetic competence and team dynamics: A quality improvement project in a stroke unit

被引:0
作者
Wuschke, Jens [1 ]
Thalhammer, Alessandra Besomi [2 ]
Gattinger, Heidrun [3 ]
机构
[1] Kantonsspital St Gallen, Dept Pflege & Therapeut Dienste, Rorschacher Str 95, CH-9007 St Gallen, Switzerland
[2] Selbststandige Kinaesthet Trainerin Stufe 3, St Gallen, Switzerland
[3] OST Ostschweizer Fachhsch, Inst Angew Pflegewissensch IPW OST, St Gallen, Switzerland
关键词
Stroke; Movement; Kinesthesis; Quality improvement; Patient care team; NURSES;
D O I
10.1007/s00063-024-01211-2
中图分类号
R5 [内科学];
学科分类号
1002 ; 100201 ;
摘要
Background: Movement training for stroke patients is a crucial component of their treatment. Lack of time and staff are often described as limiting factors for the development of kinaesthetic competence. In contrast, a positive team atmosphere and awareness of kinaesthetics are seen to be beneficial. Aim: The goal of this quality improvement project was to promote the kinaesthetic competence of a stroke unit (SU) nursing team and to investigate its influence on team dynamics. Methods: As a team intervention for the project, a basic course in kinaesthetics in nursing, augmented by practical instructions, was conducted exclusively for the SU nursing team. The Kinaesthetics Competence Observation (KCO) instrument was used to determine competence development. The participants rated team dynamics on a scale of 0-10 points. ResultsIn all, 88% of the nursing team took part in the quality improvement project and successfully completed the basic course. The kinaesthetic competence improved by 4.2 KCO points and the team dynamics also increased by around 2 points. DiscussionA basic kinaesthetics course with practical instructions improves kinaesthetic competence. Continuous instruction, long-term process implementation and support from nursing managers are required to establish kinaesthetic competence in the long term. Conclusion: The results show that a kinaesthetic training project carried out in this way has a positive influence not only on kinaesthetic competence but also on the dynamics of a care team.
引用
收藏
页码:246 / 252
页数:7
相关论文
共 50 条
  • [1] Förderung von Kinästhetikkompetenz und TeamdynamikEin Qualitätsverbesserungsprojekt in einer Stroke-UnitDeveloping kinaesthetic competence and team dynamicsA quality improvement project in a stroke unit
    Jens Wuschke
    Alessandra Besomi Thalhammer
    Heidrun Gattinger
    Medizinische Klinik - Intensivmedizin und Notfallmedizin, 2025, 120 (3) : 246 - 252
  • [2] A Structured Rounding Proforma in the Hyper Acute Stroke Unit (HASU): A Quality Improvement Project
    Ludley, Alistair
    Bahk, Anna
    Al-Shihabi, Ahmed
    JOURNAL FOR HEALTHCARE QUALITY, 2023, 45 (01) : 10 - 18
  • [3] Delirium on stroke units: a prospective, multicentric quality-improvement project
    Peter Nydahl
    Friederike Baumgarte
    Daniela Berg
    Manuela Bergjan
    Christoph Borzikowsky
    Christiana Franke
    Diana Green
    Anisa Hannig
    Hans Christian Hansen
    Armin Hauss
    Uta Hansen
    Rahel Istel
    Norma Krämer
    Karita Krause
    Renée Lohrmann
    Mohammad Mohammadzadeh-Vazifeh
    Jürgen Osterbrink
    Frederick Palm
    Telse Petersen
    Bernd Schöller
    Henning Stolze
    Max Zilezinski
    Johannes Meyne
    Nils G. Margraf
    Journal of Neurology, 2022, 269 : 3735 - 3744
  • [4] Delirium on stroke units: a prospective, multicentric quality-improvement project
    Nydahl, Peter
    Baumgarte, Friederike
    Berg, Daniela
    Bergjan, Manuela
    Borzikowsky, Christoph
    Franke, Christiana
    Green, Diana
    Hannig, Anisa
    Hansen, Hans Christian
    Hauss, Armin
    Hansen, Uta
    Istel, Rahel
    Kraemer, Norma
    Krause, Karita
    Lohrmann, Renee
    Mohammadzadeh-Vazifeh, Mohammad
    Osterbrink, Jurgen
    Palm, Frederick
    Petersen, Telse
    Schoeller, Bernd
    Stolze, Henning
    Zilezinski, Max
    Meyne, Johannes
    Margraf, Nils G.
    JOURNAL OF NEUROLOGY, 2022, 269 (07) : 3735 - 3744
  • [5] Developing a quality improvement project to tackle the desflurane problem
    Ang, King Sin
    Low, Zhao Kai
    Ng, Bryan Su Wei
    Poh, Pei Kee
    BMJ OPEN QUALITY, 2023, 12 (01)
  • [6] Exploring Stroke Outcomes Following a Door-to-Needle Quality Improvement Project
    Alcock, Susan
    Sawatzky, Jo-Ann, V
    Strome, Trevor
    Doerksen, Kathy
    CANADIAN JOURNAL OF NEUROLOGICAL SCIENCES, 2020, 47 (02) : 167 - 175
  • [7] Developing a reflection and analysis tool (We-ReAlyse) for readmissions to the intensive care unit: A quality improvement project
    Hachen, Martina
    Musy, Sarah N.
    Frohlich, Annina
    Jeitziner, Marie-Madlen
    Kindler, Angela
    Perrodin, Stephanie
    Zante, Bjoern
    Zuniga, Franziska
    Simon, Michael
    INTENSIVE AND CRITICAL CARE NURSING, 2023, 77
  • [8] A recycling quality improvement project to engage the multidisciplinary team with sustainability efforts
    Gray, Phoebe
    Gubb, Samuel
    Butler, Jessica
    Walton, Benjamin
    NURSING IN CRITICAL CARE, 2025, 30 (01) : 61 - 67
  • [9] Team dynamics within quality improvement teams: a scoping review
    Rowland, Paula
    Lising, Dean
    Sinclair, Lynne
    Baker, G. Ross
    INTERNATIONAL JOURNAL FOR QUALITY IN HEALTH CARE, 2018, 30 (06) : 416 - 422
  • [10] Effect of the Shanghai Stroke Service System (4S) on the quality of stroke care and outcomes: A prospective quality improvement project
    Xu, Jiawen
    Xie, Yanan
    Fang, Kun
    Wang, Xin
    Chen, Shengdi
    Liu, Xueyuan
    Zhao, Yuwu
    Guan, Yangtai
    Cai, Dingfang
    Li, Gang
    Liu, Jianmin
    Liu, JianRen
    Zhuang, Jianhua
    Xian, Ying
    Shen, Haipeng
    Li, Hao
    Wang, David Z.
    Campbell, Bruce C., V
    Parsons, Mark W.
    Dong, Yi
    Dong, Qiang
    INTERNATIONAL JOURNAL OF STROKE, 2023, 18 (05) : 599 - 606