INNOVATION TECHNOLOGY SOLUTION FOR ERECTION OF LARGE-SPAN COATINGS BY LIFTING MODULES

被引:0
|
作者
Tonkacheiev, Hennadii [1 ]
Ignatenko, Oleksandr [1 ]
Rashkivskyi, Volodymyr [1 ]
Dubovyk, Iryna [1 ]
Zaiets, Yuri [1 ]
机构
[1] Kyiv Natl Univ Construct & Architecture, Kyiv, Ukraine
关键词
Lifting modules; erection of coatings; mechanized process equipment; growing up of installation columns; pulling and pushing methods;
D O I
10.14571/brajets.v17.nse4.246-256
中图分类号
G40 [教育学];
学科分类号
040101 ; 120403 ;
摘要
Based on the conducted analysis of the characteristics of known organizational and technological options for non-crane lifting, including the preliminary assembly of structural- technological coating blocks on low scaffolding using the pulling method with hydraulic lifting modules placed on the tops of design columns, or the pushing method, where the support beams are pushed to the design height resting on the tops of growing lifting column shafts with the growing unit located on the foundations, a new technology has been developed. This technology for large-span coatings erection uses mechanized process equipment in the form of lifting modules. According to this method, the vertical movement of the bearing beams of the large-span coating, pre-assembled into a structural- technological block on the foundations, is performed by pushing within the space between paired columns of the supporting frame, resting on the tops of the growing installation columns. The growing up of installation column sections occurs by alternately resting the column sections on the hydraulic jacks of the lifting modules, located in the intercolumn space on the foundations, and on the lifting latch beams fixed on the external surfaces of the paired columns. Vertical guiding profiles are fixed on the internal surfaces of the paired columns to function as deviation limiters for the column sections during the growing process. This approach reduces the amount of high-altitude assembly work to the operations of final securing of the coating beams at the design height between the tops of the paired columns of the supporting frame. It automates all processes of growing the installation column sections and moving the bearing beams of the coating from the foundation level to the column top level, reducing the overall number of construction and assembly operations, shortening the erection timelines for large-span coatings, and ensuring the complete execution of erection work within a tightly built site, with dimensions not exceeding the planned dimensions of the large-span coating being erected.
引用
收藏
页码:246 / 256
页数:11
相关论文
共 35 条
  • [21] Hybrid method as the innovation solution in spraying technology of protective coatings
    Szczucka-Lasota, Bozena
    Szymanski, Krzysztof
    Piwnik, Jan
    Wegrzyn, Tomasz
    OCHRONA PRZED KOROZJA, 2018, 61 (10): : 286 - 291
  • [22] Computer vision-based real-time continuous monitoring of the pose for large-span bridge cable lifting structures
    Tang, Yao
    Huang, Bo
    Wang, Shaorui
    Zhou, Jianting
    Xiang, Zhengsong
    Sheng, Chengchong
    He, Chang
    Wang, Haizhu
    Ruan, Lingyu
    AUTOMATION IN CONSTRUCTION, 2024, 162
  • [23] DEVELOPMENT OF THE TECHNOLOGY OF CRANE-LESS LIFTING OF LONG-SPAN REINFORCED CONCRETE AND METAL COATINGS
    Tonkacheiev, Hennadii
    Ignatenko, Oleksandr
    Rashkivskyi, Volodymyr
    Dubovyk, Iryna
    Tryhub, Anna
    Sobko, Yuri
    AD ALTA-JOURNAL OF INTERDISCIPLINARY RESEARCH, 2024, 14 (01): : 271 - 275
  • [24] Analysis on Deformation Control Technology for Large-Span Subway Tunnels from High-Narrow Channel
    Yang, Lin
    Wang, Wei
    Jiang, Hong
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [25] Research on Supporting Technology for Surrounding Rock of Inclined Large-Span Open-Off Cut Roadway
    Hu, Yingru
    Liu, Yapeng
    Shi, Lizhang
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (02) : 1873 - 1884
  • [26] Floor Heave Mechanism and Anti-Slide Piles Control Technology in Deep and Large-Span Chamber
    Shi, Jian
    Kong, Desen
    APPLIED SCIENCES-BASEL, 2021, 11 (10):
  • [27] Experimental research of pipe-roof pre-supporting technology for the shallow large-span tunnel
    Tan, Zhongsheng
    Sun, Xiaojing
    Ma, Dong
    Ma, Yongchang
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2015, 48 : 429 - 434
  • [28] Research on Supporting Technology for Surrounding Rock of Inclined Large-Span Open-Off Cut Roadway
    Yingru Hu
    Yapeng Liu
    Lizhang Shi
    Geotechnical and Geological Engineering, 2020, 38 : 1873 - 1884
  • [29] Aero-elastic experiment investigation on the aerodynamic damping of large-span single-layer cable-suspended photovoltaic modules
    Xu, Haiwei
    Li, Junlong
    He, Xuhui
    Du, Hang
    Ding, Kunyang
    Lou, Wenjuan
    Zhendong yu Chongji/Journal of Vibration and Shock, 2024, 43 (10): : 21 - 29
  • [30] High pre-tension reinforcing technology and design for ultra-shallow buried large-span urban tunnels
    Wang, Qi
    Wei, Huayong
    Jiang, Bei
    Wang, Xuepeng
    Sun, Lingfeng
    He, Manchao
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2024, 182