Optimization Algorithm Based on Monte Carlo Tree Search for Single Satellite Task Planning

被引:0
作者
Zhao, Jie [1 ]
Liu, Ruixia [1 ]
Han, Yang [1 ]
机构
[1] Xian Univ Posts & Telecommun, Xian 710072, Peoples R China
来源
PROCEEDINGS OF THE 2024 3RD INTERNATIONAL SYMPOSIUM ON INTELLIGENT UNMANNED SYSTEMS AND ARTIFICIAL INTELLIGENCE, SIUSAI 2024 | 2024年
关键词
Earth observation satellite; MCTS; Mission planning;
D O I
10.1145/3669721.3674609
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Earth Observation Satellites (EOS) are pivotal elements within contemporary satellite constellations, serving vital roles in both defense and civilian realms. To refine the efficiency and efficacy of individual satellite observation missions, this paper presents a task planning solution rooted in the Monte Carlo Tree algorithm. An orbit prediction method considering the fourth order long-term perturbation item is proposed using orbital elements, and the constraint satisfaction model with various types of constraints is established. Aiming at a single satellite, the task planning algorithm based on the Monte Carlo tree search (MCTS) algorithm is proposed. Finally, through simulated comparisons with traditional ant colony algorithms, the viability of this proposed algorithm is affirmed in terms of both benefits and time efficiency.
引用
收藏
页码:264 / 267
页数:4
相关论文
共 7 条
[1]   A Survey of Monte Carlo Tree Search Methods [J].
Browne, Cameron B. ;
Powley, Edward ;
Whitehouse, Daniel ;
Lucas, Simon M. ;
Cowling, Peter I. ;
Rohlfshagen, Philipp ;
Tavener, Stephen ;
Perez, Diego ;
Samothrakis, Spyridon ;
Colton, Simon .
IEEE TRANSACTIONS ON COMPUTATIONAL INTELLIGENCE AND AI IN GAMES, 2012, 4 (01) :1-43
[2]  
Pemberton J.C., 2000, DIMACS WORKSH CONSTR
[3]  
Sarkheyli A., 2010, 2010 5th International Symposium on Telecommunications (IST), P928, DOI 10.1109/ISTEL.2010.5734155
[4]  
Schaub H, 2009, ai education
[5]   A multi-objective local search heuristic for scheduling Earth observations taken by an agile satellite [J].
Tangpattanakul, Panwadee ;
Jozefowiez, Nicolas ;
Lopez, Pierre .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 245 (02) :542-554
[6]  
Yokoo M, 2001, Constraint satisfaction problem
[7]   Coplanar ground-track adjustment using time difference [J].
Zhang, Gang ;
Cao, Xibin .
AEROSPACE SCIENCE AND TECHNOLOGY, 2016, 48 :21-27