A comparative analysis of Boron Removal using constructed wetlands and alternative technologies, highlighting key factors affecting constructed wetland efficiency

被引:0
作者
Tan, Sew Keng [1 ]
Sufian, Suriati Binti [1 ]
Chai, Pui Vun [2 ]
Han, Maylan [1 ]
Termezi, Mohammad Fauzi Bin Ahmad [1 ]
Samsudin, Mohamad Fakhrul Ridhwan [3 ]
机构
[1] Univ Teknol PETRONAS, Chem Engn Dept, Bandar Seri Iskandar 32610, Perak, Malaysia
[2] UCSI Univ, Chem Engn Dept, Kuala Lumpur 56000, Malaysia
[3] PETRONAS Res Sdn Bhd, Bangi, Malaysia
关键词
Constructed wetland; Boron; Wastewater; Phragmites australis; Typha latifolia; Vertical flow; Horizontal flow; Life cycle assessment; WASTE-WATER TREATMENT; HORIZONTAL SUBSURFACE FLOW; LIFE-CYCLE ASSESSMENT; ION-EXCHANGE; ENGINEERED WETLAND; AQUEOUS-SOLUTIONS; SMALL COMMUNITIES; NITROGEN REMOVAL; DRINKING-WATER; RICE HUSK;
D O I
10.1016/j.ecoleng.2025.107536
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
Excessive levels of boron (B) in wastewater are problematic due to their toxicity to both plants and aquatic fauna. The removal of B is both economically burdensome and technically challenging, often requiring sophisticated methods such as adsorption and reverse osmosis. Constructed wetlands (CWs) offer a promising and costeffective alternative for B removal. This review paper compiles the recent research on B removal, detailing key findings and identifying areas for potential enhancement. It provides a comparative analysis of CWs with other B removal technologies, evaluates the environmental impact of CWs in terms of COQ-equivalent reduction, and examines the various pathways for B removal. Factors influencing the efficiency of B removal, such as CW type, plant selection, choice of media, hydraulic retention time (HRT), hydraulic loading rate (HLR), mass loading rate (MLR), pH, and inlet B concentrations, are thoroughly reviewed. Based on the compiled data, the recommended operating conditions to optimize B removal in CWs include an HRT of 10 to 14 days, a pH range between 6 and 10, inlet B concentrations below 20 mg/L, and a mass loading rate under 3000 mg/m2 per day.
引用
收藏
页数:16
相关论文
共 35 条
  • [31] Evaluating the role of hydraulic retention time (HRT) in pollutant removal efficiency using Arundo donax in vertical subsurface flow constructed wetlands
    Ahmed, Ali M.
    Kareem, Sabreen L.
    BIOREMEDIATION JOURNAL, 2024,
  • [32] Contaminant Removal Efficiency from Domestic Wastewater Using Experimental Constructed Wetlands Planted with Cyperus ligularis (Cyperaceae) and Echinochloa colonum (Poaceae)
    Carlos Charris, Jhan
    Caselles-Osorio, Aracelly
    TECNOLOGIA Y CIENCIAS DEL AGUA, 2016, 7 (06) : 93 - 103
  • [33] Comparative analysis of upward and downward vertical flow constructed wetlands on the nitrogen removal and functional microbes treating wastewater containing Ag nanoparticles
    Cao, Chong
    Huang, Juan
    Yan, Chun-Ni
    Ma, Yi-Xuan
    Xiao, Jun
    Zhang, Xin-Xin
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2021, 278
  • [34] Modeling of a Surface Flow Constructed Wetland Using the HEC-RAS and QUAL2K Models: a Comparative Analysis
    Linpeng Xiao
    Zhi Chen
    Fayi Zhou
    Samia ben Hammouda
    Yinying Zhu
    Wetlands, 2020, 40 : 2235 - 2245
  • [35] Comparative evaluation of total phosphorus removal performances for treatment of domestic and secondary wastewater using integrated vertical-flow constructed wetlands: two years' experience
    Chang, Jun-jun
    Wu, Su-qing
    Zhang, Shi-yang
    Zhang, Sheng-hua
    Liang, Wei
    DESALINATION AND WATER TREATMENT, 2015, 56 (05) : 1379 - 1388