Co-Optimization of Cable Layout and Switch Configuration for Reliable Electrical Collector System of Offshore Wind Farm

被引:0
作者
Ding, Xiaochi [1 ]
Shen, Xinwei [1 ]
Wu, Qiuwei [1 ]
Zhang, Xuan [1 ]
Hatziargyriou, Nikos [2 ]
机构
[1] Tsinghua Univ, Tsinghua Shenzhen Int Grad Sch, Shenzhen, Peoples R China
[2] Natl Tech Univ Athens, Sch Elect & Comp Engn, Athens, Greece
来源
2024 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, PESGM 2024 | 2024年
关键词
electrical collector system planning; offshore wind farm; reliability; switch configuration; RELIABILITY;
D O I
10.1109/PESGM51994.2024.10688617
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Effective electrical collector system (ECS) planning is crucial for reducing initial investments, enhancing reliability, and optimizing the overall efficiency of offshore wind farms (OWFs). ECS planning includes the optimization of cable layout as well as switch configuration. However, most studies predominantly oversimplify or even ignore the placement strategy of switch devices. Moreover, it is common practice to employ the iterative two-phase planning approach with posterior reliability evaluation, rather than utilizing a comprehensive planning model with built-in reliability constraints. To tackle these issues, this paper proposes a co-optimization approach for cable layout and switch configuration, taking into account the distinct roles of circuit breakers and isolation switches in the fault management process. The explicit relationship between ECS reliability, device planning, and operation decisions is established by the virtual fault flow method. Thus the reliability-related constraints can be integrated into the ECS planning model, which obtains the optimal cable layout and switch configuration satisfying the reliability requirements. Test results validate the efficacy of the proposed method in avoiding over-investment and highlight its advantage over the conventional two-phase approach by achieving an improved balance between cost-efficiency and reliability in OWFs.
引用
收藏
页数:5
相关论文
共 50 条
[21]   Research on Wideband Harmonic Resonance of Collector System in Offshore Wind Farm [J].
Qin, Yao ;
Wang, Han ;
Li, Yan ;
Cai, Xu ;
Shi, Xianqiang ;
Dai, Linwang .
2021 IEEE 12TH ENERGY CONVERSION CONGRESS AND EXPOSITION - ASIA (ECCE ASIA), 2021, :1469-1474
[22]   Layout optimization of offshore wind farm considering spatially inhomogeneous wave loads [J].
Ti Zilong ;
Wei, Deng Xiao .
APPLIED ENERGY, 2022, 306
[23]   Optimization of Power Collector System for Large-scale Offshore Wind Farm Based on Topological Redundancy Assessment [J].
Wei S. ;
Liu K. ;
Fu Y. ;
Feng Y. ;
Hu H. ;
Zhang K. .
Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2018, 42 (18) :84-90
[24]   An intelligent system for offshore wind farm maintenance scheduling optimization considering turbine production loss [J].
Feng, Jianshe ;
Jia, Xiaodong ;
Zhu, Feng ;
Yang, Qibo ;
Pan, Yubin ;
Lee, Jay .
JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2019, 37 (05) :6911-6923
[25]   Reliability Evaluation of Electrical Collector System of Wind farm Based on Sequential Monte Carlo [J].
Wen, Lili ;
Wang, Manli ;
Zhou, Ping ;
Zhou, Qian ;
Hu, Bo ;
Ma, Yinghao ;
Xia, Yun ;
Xiao, Ruosong ;
Li, Bo .
2016 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS), 2016,
[26]   A Two-Phase Approach for the Electrical Layout Optimization of the Offshore Wind Farms [J].
Castro, Rodrigo Miguel ;
Silva, Bernardo ;
Kazemi-Robati, Ehsan .
2024 IEEE 22ND MEDITERRANEAN ELECTROTECHNICAL CONFERENCE, MELECON 2024, 2024, :104-109
[27]   A synchronization methodology for 3D offshore wind farm layout optimization with multi-type wind turbines and obstacle-avoiding cable network [J].
Wu, Yan ;
Xia, Tianqi ;
Wang, Yufei ;
Zhang, Haoran ;
Feng, Xiao ;
Song, Xuan ;
Shibasaki, Ryosuke .
RENEWABLE ENERGY, 2022, 185 :302-320
[28]   Optimization of Electrical Connection Scheme for Large Offshore Wind Farm with Genetic Algorithm [J].
Huang Lingling ;
Fu Yang ;
Guo Xiaoming .
2009 INTERNATIONAL CONFERENCE ON SUSTAINABLE POWER GENERATION AND SUPPLY, VOLS 1-4, 2009, :1003-+
[29]   Optimization of Electrical Connection Scheme for Large Offshore Wind Farm with Genetic Algorithm [J].
Huang Lingling ;
Fu Yang ;
Guo Xiaoming .
2009 INTERNATIONAL CONFERENCE ON SUSTAINABLE POWER GENERATION AND SUPPLY, VOLS 1-4, 2009, :1409-+
[30]   Hierarchical Optimization of Installed Capacity and Layout of Offshore Wind Farm Considering Market Bidding and Acceptance [J].
Zhang J. ;
Jiang Y. .
Dianwang Jishu/Power System Technology, 2020, 44 (10) :3837-3845