Improved dual-population genetic algorithm to solve human-robot collaborative assembly line balancing problem

被引:0
|
作者
Cai, Jiahong [1 ,2 ]
Xue, Haoyun [1 ,2 ]
Zheng, Chengye [1 ,2 ]
Shi, Hongyan [1 ,2 ]
机构
[1] Shenzhen Univ, State Key Lab Radio Frequency Heterogeneous Integr, Shenzhen 518060, Peoples R China
[2] Shenzhen Univ, Shenzhen Key Lab Adv Mfg Technol Mold & Die, Shenzhen, Peoples R China
关键词
Assembly line balancing problem; human-robot collaboration; genetic algorithm; multi-objective optimisation; cobot; OPTIMIZATION ALGORITHM; CLASSIFICATION; ASSIGNMENT;
D O I
10.1080/00207543.2025.2473067
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The human-robot collaborative assembly line has been applied as an effective strategy in production to further improve the efficiency, adaptability, and flexibility. The assembly line balancing is an important part of assembly line design and optimisation. However, the current research often neglects the key factor of the number of stations, which lacks better guidance for the actual assembly line design and optimisation. To provide a better practical reference, this research first takes the number of stations, the makespan and the balance ratio as the optimisation objectives, and constructs a corresponding model. Then, an improved dual-population genetic algorithm is designed to solve the problem more efficiently. This algorithm optimises multiple operators based on the traditional genetic algorithm. The efficacy of the proposed algorithm is substantiated through numerical experimentation with three traditional heuristic algorithms. The experimental results show that the improved algorithm has superior performance in solving the human-robot collaborative assembly line balancing problem. On the one hand, the average improvement of fitness in different scale cases reaches 3.14% (up to 52.33%), and the distribution of solutions is more stable. On the other hand, the convergence speed is faster, the average reduction of convergence time is 11.50% (up to 88.24%).
引用
收藏
页数:23
相关论文
共 50 条
  • [31] Product family assembly line balancing based on an improved genetic algorithm
    Hou, Liang
    Wu, Yong-ming
    Lai, Rong-shen
    Tsai, Chi-Tay
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (9-12): : 1775 - 1786
  • [32] The Improved Genetic Algorithm for Balancing Mixed-model Assembly Line
    Tang, Qiuhua
    Liang, Yanli
    NUMBERS, INTELLIGENCE, MANUFACTURING TECHNOLOGY AND MACHINERY AUTOMATION, 2012, 127 : 603 - 608
  • [33] Product family assembly line balancing based on an improved genetic algorithm
    Liang Hou
    Yong-ming Wu
    Rong-shen Lai
    Chi-Tay Tsai
    The International Journal of Advanced Manufacturing Technology, 2014, 70 : 1775 - 1786
  • [34] Multiple Product Hybrid Disassembly Line Balancing Problem With Human-Robot Collaboration
    Qin, Shujin
    Xiang, Changsheng
    Wang, Jiacun
    Liu, Shixin
    Guo, Xiwang
    Qi, Liang
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2025, 22 : 712 - 723
  • [35] Research on the problem of MC assembly line balancing based on genetic algorithm
    Yang, Shuili
    Huang, Weiping
    ADVANCES IN MATERIALS MANUFACTURING SCIENCE AND TECHNOLOGY II, 2006, 532-533 : 1076 - +
  • [36] A Multiobjective Genetic Algorithm for Assembly Line Balancing Problem with Worker Allocation
    Zhang, Wenqiang
    Gen, Mitsuo
    Lin, Lin
    2008 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC), VOLS 1-6, 2008, : 3025 - 3032
  • [37] U-shaped assembly line balancing problem with genetic algorithm
    Hwang, Rea Kook
    Katayama, Hiroshi
    Gen, Mitsuo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (16) : 4637 - 4649
  • [38] Task allocation of human-robot collaborative assembly line considering assembly complexity and workload balance
    Cai, Min
    Wang, Gen
    Luo, Xinggang
    Xu, Xueqi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2025,
  • [39] AN IMPROVED GENETIC SIMULATED ANNEALING ALGORITHM FOR STOCHASTIC TWO-SIDED ASSEMBLY LINE BALANCING PROBLEM
    Yang, M. S.
    Ba, L.
    Liu, Y.
    Zheng, H. Y.
    Yan, J. T.
    Gao, X. Q.
    Xiao, J. M.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2019, 18 (01) : 175 - 186
  • [40] Human-Robot Collaborative Disassembly Line Balancing Problem With Stochastic Operation Time and a Solution via Multi-Objective Shuffled Frog Leaping Algorithm
    Guo, Xiwang
    Fan, Chenyang
    Zhou, Mengchu
    Liu, Shixin
    Wang, Jiacun
    Qin, Shujin
    Tang, Ying
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024, 21 (03) : 4448 - 4459