Floor Heave Mechanism and Control Technique of Water-Rich Soft-Rock Roadway in Thick Coal Seam

被引:0
作者
He, Fulian [1 ,2 ]
Zhai, Wenli [1 ]
Liu, Weixin [3 ]
Sun, Ning [3 ]
Song, Jiayu [1 ]
Zhang, Jianlong [1 ]
Wu, Yanhao [1 ]
机构
[1] China Univ Min & Technol, Sch Energy & Min Engn, Beijing, Peoples R China
[2] China Univ Min & Technol, Beijing Key Lab Precise Min Intergrown Energy & Re, Beijing, Peoples R China
[3] Shandong Energy Grp Luxi Min Co Ltd, Heze, Peoples R China
基金
中国国家自然科学基金;
关键词
floor heave mechanism; soft rock roadway; surrounding rock control; thick coal seam; water-rich; SIDE; REINFORCEMENT; SYSTEM;
D O I
10.1002/ese3.1956
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The severe deformation of the surrounding rock of the coal floor in Shanghaimiao mining area is affecting the safe, efficient production of mine wells in this region. In this study, the heave mechanism and control of the roadway floor were investigated through laboratory experiments, field research, theoretical analysis, numerical simulation, and on-site testing. The results showed that the main reason for the serious damage to the roadway floor was the low strength of the surrounding rock of the roadway floor, and floor damage was exacerbated by the low support strength, hydraulic effects, and mining impact. A mechanical model of the asymmetric floor heave was established, and it was found that the stability of the roadway floor was positively correlated with the floor rock type, the stress concentration coefficients on the two sides of the roadway, and the burial depth, whereas it was negatively correlated with the cohesive force and internal friction angle of the floor rock mass. Expressions for the upward resultant force R of the roadway floor and the stress concentration coefficients K and K ' on both sides of the roadway were derived. The results of a FLAC3D numerical simulation analysis showed that the stress peak in front of the working face was 36 MPa, with a stress concentration factor of 3.7. After the floor support was reinforced, the floor heave was remarkably reduced, with a maximum value of approximately 600 mm, and the floor deformation became somewhat asymmetric. Finally, a double-seal floor-reinforcing "inverted arch" control technique was proposed and tested on-site. The new system could efficiently and stably support the surrounding rock of the roadway.
引用
收藏
页码:5316 / 5327
页数:12
相关论文
共 40 条
[1]  
Afrouz A., 1988, International Journal of Mining and Geological Engineering, V6, P297
[2]   Risk Analysis and Prediction of Floor Failure Mechanisms at Longwall Face in Parvadeh-I Coal Mine using Rock Engineering System (RES) [J].
Aghababaei, Sajjad ;
Saeedi, Gholamreza ;
Jalalifar, Hossein .
ROCK MECHANICS AND ROCK ENGINEERING, 2016, 49 (05) :1889-1901
[3]   Evolution law and engineering application on main stress difference for a novel stress relief technology in two ribs on deep coal roadway [J].
Chen, Dong-dong ;
Jiang, Zai-sheng ;
Ma, Xiang ;
Xie, Sheng-rong ;
Wang, En ;
Li, Hui .
JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2023, 30 (07) :2266-2283
[4]   Mechanism and key parameters of stress load-off by innovative asymmetric hole-constructing on the two sides of deep roadway [J].
Chen, Dongdong ;
Jiang, Zaisheng ;
Xie, Shengrong .
INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2023, 10 (01)
[5]   Reasonable location of stopping line in close-distance underlying coal seam and partition support of large cross-section roadway [J].
Chen, Dongdong ;
Wu, Yiyi ;
Xie, Shengrong ;
Guo, Fangfang ;
He, Fulian ;
Liu, Ruipeng .
INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2022, 9 (01)
[6]   Control mechanism and technique of floor heave with reinforcing solid coal side and floor corner in gob-side coal entry retaining [J].
Chen Yong ;
Bai Jianbiao ;
Yan Shuai ;
Xu Ying ;
Wang Xiangyu ;
Ma Shuqi .
INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2012, 22 (06) :841-845
[7]  
Chu MX, 2011, ROCK SOIL MECH, V32, P413
[8]  
Chugh Y., 1984, Analysis of Soft Floor Interaction in Underground Mining at an Iuinoif Basin Coal Mine. Design and Performance of Underground Excavations
[9]   Floor Heave Mechanism of Gob-Side Entry Retaining with Fully-Mechanized Backfilling Mining [J].
Gong, Peng ;
Ma, Zhanguo ;
Ni, Xiaoyan ;
Zhang, Ray Ruichong .
ENERGIES, 2017, 10 (12)
[10]  
Haramy K., 1986, Floor Heave Analysis in a Deep Coal Mine. Proc. of the 27th U.S. Symposium on Rock Mechanics