Reliability optimization of reliability-redundancy allocation problems based on K-mixed strategy

被引:0
|
作者
Ge, Haiyang [1 ,2 ]
Gao, Haibo [3 ]
Li, Xin [1 ,2 ]
机构
[1] Shanghai Jiao Tong Univ, State Key Lab Ocean Engn, 800 Dongchuan Rd,Minhang Campus, Shanghai 200240, Peoples R China
[2] Shanghai Jiao Tong Univ, Inst Hainan Res, Sanya, Hainan, Peoples R China
[3] Wuhan Univ Technol, Sch Naval Architecture Ocean & Energy Power Engn, Wuhan, Peoples R China
关键词
Reliability optimization; reliability-redundancy allocation problem (RRAP); K-mixed strategy; Nondominated Sorting Genetic Algorithm (NSGA-II); SERIES-PARALLEL SYSTEMS; PARTICLE SWARM OPTIMIZATION; MULTIOBJECTIVE OPTIMIZATION; GENETIC ALGORITHMS; DIFFERENTIAL EVOLUTION; 2-PHASE APPROACH; CUCKOO SEARCH; DESIGN; CHOICE;
D O I
10.1177/1748006X241272814
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In a reliability-redundancy allocation problem (RRAP), system reliability is maximized by selecting component reliabilities and finding the most suitable redundancy of subsystems. The advantages of a K-mixed strategy were introduced by modeling, so as to better improve system reliability. Compared with other existing redundancy strategies, the performance of a K-mixed strategy was verified using redundancy allocation problems (RAP). In this study, for the first time, a reliability calculation model under the new structure ( n A = 2 and n s = 1) is proposed, and the K-mixed strategy under the new structure is used in the reliability-RAP (RRAP), which is more complex than the RAP and further saves the production cost. In practical optimization, there was a complex decision-making problem to ensure optimal system reliability while minimizing system volume, weight, and cost. Then, this K-mixed strategy was adopted for modeling three benchmark problems in RRAP to seek a better and more flexible system structure. A powerful evolutionary algorithm (NSGA-II) was used to solve the new RRAP model to obtain the best system structure and reliability. The advantages of this model were confirmed by comparison with results from previous reliability optimization studies. The results show that the cost-saving advantages of the new structure in ensuring maximum reliability are significant. All the optimized remaining costs are noticeably higher than those of other methods, with the cost savings of the series-parallel system being the greatest. The difference in remaining costs compared to previous optimizations remains in the tens. Moreover, in more complex systems (Complex bridge system), the advantage in remaining volume is very significant, with the improvement being three times that of the optimization results of other methods.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] A new model for the reliability-redundancy allocation problem under the K-mixed redundancy strategy
    Zavieh, Negar Hossein
    Ardakan, Mostafa Abouei
    Davari-Ardakani, Hamed
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2022, 92 (17) : 3542 - 3560
  • [2] K-mixed strategy: A new redundancy strategy for reliability problems
    Peiravi, Abdossaber
    Karbasian, Mahdi
    Ardakan, Mostafa Abouei
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2018, 232 (01) : 38 - 51
  • [3] Reliability optimization of series-parallel systems with K-mixed redundancy strategy
    Peiravi, Abdossaber
    Karbasian, Mandi
    Ardakan, Mostafa Abouei
    Coit, David W.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2019, 183 : 17 - 28
  • [4] A new model for the reliability-redundancy allocation problem with the mixed redundancy strategy
    Mahdavi-Nasab, Narges
    Ardakan, Mostafa Abouei
    Peiravi, Abdossaber
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2022, 92 (14) : 2956 - 2979
  • [5] Optimization of Reliability-Redundancy Allocation Problems: A Review of the Evolutionary Algorithms
    Marouani, Haykel
    Al-mutiri, Omar
    CMC-COMPUTERS MATERIALS & CONTINUA, 2022, 71 (01): : 537 - 571
  • [6] Improved Bat Algorithm for Reliability-Redundancy Allocation Problems
    Liu, Yubao
    INTERNATIONAL JOURNAL OF SECURITY AND ITS APPLICATIONS, 2016, 10 (02): : 1 - 12
  • [7] A hybrid Jaya algorithm for reliability-redundancy allocation problems
    Ghavidel, Sahand
    Azizivahed, Ali
    Li, Li
    ENGINEERING OPTIMIZATION, 2018, 50 (04) : 698 - 715
  • [8] Reliability-redundancy allocation problem with cold-standby redundancy strategy
    Ardakan, Mostafa Abouei
    Hamadani, Ali Zeinal
    SIMULATION MODELLING PRACTICE AND THEORY, 2014, 42 : 107 - 118
  • [9] IPSO-based hybrid approaches for reliability-redundancy allocation problems
    ZHANG HongQi
    HU XiangTao
    SHAO XiaoDong
    LI ZiCheng
    WANG YuHui
    Science China(Technological Sciences), 2013, (11) : 2854 - 2864
  • [10] An improved particle swarm optimization algorithm for reliability-redundancy allocation problem with mixed redundancy strategy and tor heterogeneous components
    Ouyang, Zhiyuan
    Liu, Yu
    Ruan, Sheng-Jia
    Jiang, Tao
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2019, 181 : 62 - 74