Evolution of Soil Arching in Geosynthetic-Reinforced Pile-Supported Embankment of a High-Speed Railway under Long-Term Train Traffic Loading and Excessive Subsoil Settlement

被引:0
|
作者
Liu, Shun [1 ]
Yu, Hongyuan [1 ]
Zhao, Chuang [2 ]
Bian, Xuecheng [1 ]
Chen, Yunmin [1 ]
机构
[1] Zhejiang Univ, Dept Civil Engn, Key Lab Soft Soils & Geoenvironm Engn, Minist Educ, Hangzhou 310058, Peoples R China
[2] Zhejiang Univ, Ctr Hypergrav Expt & Interdisciplinary Res, Hangzhou 310058, Peoples R China
基金
中国国家自然科学基金;
关键词
Dynamic soil stress; Full-scale model; High-speed railway; Pile efficacy; Pile-supported embankment; Soil arching; FINITE-ELEMENT-ANALYSIS; MODEL; BEHAVIOR;
D O I
10.1061/JGGEFK.GTENG-12497
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Soil arching formed in geosynthetic-reinforced pile-supported (GRPS) embankments of high-speed railways plays an important role in transferring the forces within the embankments. In most cases of notable settlements and track irregularity of high-speed railways in China, excessive subsoil settlements and induced degradation of soil arching under long-term moving train loads are considered to be the primary causes. However, the evolution of soil arching remains unclear to date. Herein, a full-scale model of typical GRPS embankment of high-speed railways with dimensions of 5.5 (length)x15 (width)x6 m (height) was established in the laboratory. Firstly, pile efficacy was evaluated during model preparation, which increased with the filling height and stabilized at 89%, due to the normal differential settlement between piles and subsoil. Afterward, the evolution of soil arching under moving train loads applied for up to 500,000 carriages with axle loads ranging from 17 to 25 tons and speeds from 50 to 360 km/h was studied, followed by another comparative condition with excessive differential settlements up to 90 mm between piles and subsoil. The dynamic testing results indicated that the dynamic pile efficacy under normal conditions remained consistent regardless of variations in train speed and axle load. Nevertheless, it decreased by 13.4% under the excessive differential settlement condition when the speed was higher than 150 km/h but was nearly unchanged under variations in only axle load from 17 to 40 tons. Besides, the height of outer soil arching increased from 1.3 to 1.7 m as the differential settlement reached 90 mm, presenting a notable variation of arching shape. Two empirical formulas considering various train speeds and axle loads were then proposed to describe the dynamic soil stress and pile efficacy on the surface of piled system. From the long-term loading tests, both the static and dynamic pile efficacy in the normal case increased by 0.9% and 2.8%, respectively, while those in the case with excessive differential settlement decreased by 4.8% and 3.9%, respectively. These results would contribute to the long-term performance evaluation of soil arching within GRPS embankment of high-speed railways, especially above soft soil foundations.
引用
收藏
页数:17
相关论文
共 24 条
  • [1] Long-Term Stability of High-Speed Railway Geosynthetic Reinforced Pile-Supported Embankment Subjected to Traffic Loading Considering Arching Effect
    Bi, Zongqi
    Gong, Quanmei
    Huang, Jiandan
    TRANSPORTATION RESEARCH RECORD, 2020, 2674 (07) : 596 - 607
  • [2] Physical model study of pile type effect on long-term settlement of geosynthetic-reinforced pile-supported embankment under traffic loading
    Liu, Kai -Fu
    Feng, Wei-Qiang
    Cai, Yong-Hao
    Xu, Hui
    Wu, Pei-Chen
    TRANSPORTATION GEOTECHNICS, 2023, 38
  • [3] Performance of Geosynthetic-Reinforced and Pile-Supported Embankment with Consideration of Soil Arching
    Zhang, Ling
    Zhou, Shuai
    Zhao, Heng
    Deng, Yun
    JOURNAL OF ENGINEERING MECHANICS, 2018, 144 (12)
  • [4] Dynamic Analysis of Geosynthetic-reinforced Pile-supported Embankment for a High-Speed Rail
    Alsirawan, Rashad
    Koch, Edina
    ACTA POLYTECHNICA HUNGARICA, 2024, 21 (01) : 31 - 50
  • [5] Long term measurements in the Woerden geosynthetic-reinforced pile-supported embankment
    van Eekelen, S. J. M.
    Venmans, A. A. M.
    Bezuijen, A.
    van Tol, A. F.
    GEOSYNTHETICS INTERNATIONAL, 2020, 27 (02) : 142 - 156
  • [6] MONITORING AND ANALYSIS ON THE SETTLEMENT OF GEOSYNTHETIC-REINFORCED PILE-SUPPORTED EMBANKMENTS ON SOFT GROUND FOR A HIGH-SPEED RAILWAY
    Jiang, Alan
    Zhao, Lihua
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 487 - 490
  • [7] Analysis of geosynthetic-reinforced pile-supported embankment based on H&R soil arching model
    Zheng J.
    Luo X.
    Fu H.
    Cao W.
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2019, 47 (01): : 50 - 54
  • [8] Soil Arching Effect in High-Speed Railway GRPS Embankment Subjected to Long-Term Traffic Loading
    Bi, Zongqi
    Gong, Quanmei
    Zhou, Shunhua
    Huang, Jiandan
    PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 803 - 812
  • [9] 3D modeling of geosynthetic-reinforced pile-supported embankment under cyclic loading
    Pham, H., V
    Dias, D.
    Dudchenko, A.
    GEOSYNTHETICS INTERNATIONAL, 2020, 27 (02) : 157 - 169
  • [10] Two-dimensional soil arching evolution in geosynthetic-reinforced pile-supported embankments over voids
    Rui, Rui
    Ye, Yu-qiu
    Han, Jie
    Zhai, Yu-xin
    Wan, Yi
    Chen, Cheng
    Zhang, Lei
    GEOTEXTILES AND GEOMEMBRANES, 2022, 50 (01) : 82 - 98