Generalized Optimal Scheduling of Cluster Tools With Reentrance and Residency Time Constraints

被引:0
|
作者
Li, Xin [1 ]
机构
[1] Educ Univ Hong Kong, Dept Math & Informat Technol, Hong Kong, Peoples R China
来源
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS | 2025年 / 55卷 / 01期
关键词
Generalized formulation; mixed-integer linear programming; reentrance; residency time; single-arm and dual-arm cluster tools; COMPLETION-TIME; WAFER DELAY; SCHEDULABILITY; PERFORMANCE; CHAMBERS;
D O I
10.1109/TSMC.2024.3466991
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Cluster tools have been widely used in the semiconductor industry. In previous work, singe-arm and dual-arm cluster tools are dealt with separately. When considering residency time constraints, algorithms for scheduling robot moving sequences are mainly developed based on backward and swap strategies, respectively. How about the performance of other robot moving sequences is still an open problem. The present work addresses general conditions by considering all feasible robot moving sequences-beyond backward- and swap-based strategies. In addition, both dual-arm and single-arm cluster tools with reentrance are handled simultaneously. To solve this, the problem is first divided into two parts-the basic one without reentrance and reentrant operations. Based on detailed analysis of all available robot operations in a cluster tool, mixed-integer programming formulations are developed for both parts. Subsequently, both illustrative examples and randomly generated instances are tested to validate the efficiency of the proposed approach. Results of one example show improvement comparing to previous work. Another two examples-not scheduled previously-are scheduled well by the proposed approach. Meanwhile, the flexibility of operations obtained by the proposed model is demonstrated by an example with six processing modules and 12 stages in a dual-arm cluster tool. Additionally, more randomly generated instances are tested more to validate the proposed approach and analyze computation time.
引用
收藏
页码:307 / 318
页数:12
相关论文
共 50 条
  • [31] Efficient and Optimal Scheduling of Time-constrained Hybrid Multi-cluster Tools in Semiconductor Industry
    Yang, FaJun
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    2016 IEEE 13TH INTERNATIONAL CONFERENCE ON NETWORKING, SENSING, AND CONTROL (ICNSC), 2016,
  • [32] Optimal One-Wafer Cyclic Scheduling of Hybrid Multirobot Cluster Tools With Tree Topology
    Yang, FaJun
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2018, 48 (02): : 289 - 298
  • [33] Scheduling method for single-arm cluster tools of wafer fabrications with residency and continuous reentrancy
    Zhou, Binghai
    Wang, Zhu
    Chen, Jia
    Journal of Southeast University (English Edition), 2013, 29 (02) : 187 - 193
  • [34] Modeling and Optimal Cyclic Scheduling of Time-Constrained Single-Robot-Arm Cluster Tools via Petri Nets and Linear Programming
    Yang, FaJun
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    Su, Rong
    Qu, Ting
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2020, 50 (03): : 871 - 883
  • [35] Robust Scheduling of Time-Constrained Dual-Arm Cluster Tools With Wafer Revisiting and Activity Time Disturbance
    Qiao, Yan
    Wu, NaiQi
    Yang, FaJun
    Zhou, MengChu
    Zhu, QingHua
    Qu, Ting
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2019, 49 (06): : 1228 - 1240
  • [36] Analysis of Wafer Sojourn Time in Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation
    Wu, NaiQi
    Zhou, MengChu
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2010, 23 (01) : 53 - 64
  • [37] Scheduling Dual-Arm Multi-Cluster Tools With Regulation of Post-Processing Time
    Zhu, Qinghua
    Li, Bin
    Hou, Yan
    Li, Hongpeng
    Wu, Naiqi
    IEEE-CAA JOURNAL OF AUTOMATICA SINICA, 2023, 10 (08) : 1730 - 1742
  • [38] Wafer Residency Time Analysis for Time-Constrained Single-Robot-Arm Cluster Tools With Activity Time Variation
    Yang, Fajun
    Tang, Xin
    Wu, Naiqi
    Zhang, Chunjiang
    Gao, Liang
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2020, 28 (04) : 1177 - 1188
  • [39] Optimal scheduling of continuous plants with energy constraints
    Castro, Pedro M.
    Harjunkoski, Iiro
    Grossmann, Ignacio E.
    COMPUTERS & CHEMICAL ENGINEERING, 2011, 35 (02) : 372 - 387
  • [40] Wafer Delay Minimization in Scheduling Single-Arm Cluster Tools with Two-Space Process Modules
    Zou, Chengyu
    Zhang, Siwei
    Zeng, Shan
    Gu, Lei
    Li, Jie
    MATHEMATICS, 2024, 12 (12)