Integrated scheduling of gantry cranes, container trucks and yard cranes in on-dock railway operation areas at multimodal container ports

被引:0
|
作者
Xia, Tian [1 ]
Wang, Li [1 ]
Zhang, Qin [1 ]
Dong, Jing-Xin [2 ]
Song, Dong-Ping [3 ]
Zhu, Xiaoning [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing 100044, Peoples R China
[2] Newcastle Univ, Business Sch, 5 Barrack Rd, Newcastle Upon Tyne NE1 4SE, England
[3] Univ Liverpool, Management Sch, Liverpool, England
基金
中国国家自然科学基金; 英国工程与自然科学研究理事会;
关键词
containers; scheduling; sea ports; DYNAMIC-PROGRAMMING APPROACH; TIME WINDOWS; TRANSSHIPMENT; NETWORK; TERMINALS;
D O I
10.1049/itr2.12600
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
On-dock railway operation areas at sea-rail container ports play a crucial role in transferring containers between maritime and rail transportation systems. The operational efficiency of these areas depends on synchronizing rail and yard container handling equipment, including gantry cranes, container trucks, and yard cranes. However, time-sensitive container handling, seamless equipment coordination, and complex operational conflicts make multi-equipment scheduling a challenging decision-making problem. This study introduces an integrated scheduling method that both alleviates inter-equipment interferences and balances gantry cranes' workloads. The underlying problem is formulated as a binary integer programming model using a novel space-time-state network. According to the specific model structure, a model reformulation method is proposed here to convert the original three-equipment scheduling model into a single-equipment scheduling version. Additionally, a Lagrangian relaxation-based heuristic is developed to efficiently solve the reformulated model. Numerical experiments are conducted to validate the effectiveness of the proposed solution approach under various instance settings and provide managerial insights into the problem. Computational results demonstrate that the effectiveness and efficiency of the proposed solution approach. Furthermore, the results also indicate that enhanced operational efficiency in the operation area can only be achieved when the railway and storage side handling capacities are well-matched.
引用
收藏
页数:35
相关论文
共 50 条
  • [1] Scheduling quay cranes and yard trucks for unloading operations in container ports
    Zhen, Lu
    Yu, Shucheng
    Wang, Shuaian
    Sun, Zhuo
    ANNALS OF OPERATIONS RESEARCH, 2019, 273 (1-2) : 455 - 478
  • [2] Scheduling quay cranes and yard trucks for unloading operations in container ports
    Lu Zhen
    Shucheng Yu
    Shuaian Wang
    Zhuo Sun
    Annals of Operations Research, 2019, 273 : 455 - 478
  • [3] Integrated scheduling of yard cranes, external trucks, and internal trucks in maritime container terminal operation
    Gao, Yunfeng
    Ge, Ying-En
    MARITIME POLICY & MANAGEMENT, 2023, 50 (05) : 629 - 650
  • [4] Simultaneous Allocation and Scheduling of Quay Cranes, Yard Cranes, and Trucks in Dynamical Integrated Container Terminal Operations
    Cahyono, Rully Tri
    Kenaka, Saskia Puspa
    Jayawardhana, Bayu
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2022, 23 (07) : 8564 - 8578
  • [5] Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals
    Behjat, S.
    Nahavandi, N.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2020, 33 (09): : 1751 - 1758
  • [6] Integrated Scheduling of Rail-Mounted Gantry Cranes, Internal Trucks and Reach Stackers in Railway Operation Area of Container Terminal
    Yan, Baicheng
    Zhu, Xiaoning
    Wang, Li
    Chang, Yimei
    TRANSPORTATION RESEARCH RECORD, 2018, 2672 (09) : 47 - 58
  • [7] A Flexible Scheduling Mode of Gantry Cranes for Railway Container Terminal
    Xie, Mei
    Wang, Li
    Yang, Wanqi
    2018 INTERNATIONAL SEMINAR ON COMPUTER SCIENCE AND ENGINEERING TECHNOLOGY (SCSET 2018), 2019, 1176
  • [8] Operations scheduling for rail mounted gantry cranes in a container terminal yard
    Bian Z.
    Li N.
    Li X.-J.
    Jin Z.-H.
    Journal of Shanghai Jiaotong University (Science), 2014, 19 (03) : 337 - 345
  • [9] Operations Scheduling for Rail Mounted Gantry Cranes in a Container Terminal Yard
    边展
    李娜
    李向军
    靳志宏
    JournalofShanghaiJiaotongUniversity(Science), 2014, 19 (03) : 337 - 345
  • [10] Multiobjective Scheduling for Cooperative Operation of Multiple Gantry Cranes in Railway Area of Container Terminal
    Li, Wenfeng
    Du, Shuaishuai
    Zhong, Lingchong
    He, Lijun
    IEEE ACCESS, 2022, 10 : 46772 - 46781