共 47 条
- [1] Luo C., Gong W., Lu C., Knowledge-driven two-stage memetic algorithm for energy-efficient flexible job shop scheduling with machine breakdowns, Expert Syst. Appl, 235, (2024)
- [2] Zhang G., Sun J., Liu X., Wang G., Yang Y., Solving flexible job shop scheduling problems with transportation time based on improved genetic algorithm, Math. Biosci. Eng, 16, pp. 1334-1347, (2019)
- [3] Du B., Han S., Guo J., Li Y., A hybrid estimation of distribution algorithm for solving assembly flexible job shop scheduling in a distributed environment, Eng. Appl. Artif. Intell, 133, (2024)
- [4] Wang L., Deng J., Wang S.-Y., Survey on optimization algorithms for distributed shop scheduling (Review), Control Decis, 31, pp. 1-11, (2016)
- [5] Caldeira R., Honnungar S., Kumar G.C.M., Feasibility study for converting traditional line assembly into work cells for termination of fiber optics cable, AIP Conf. Proc, 1943, (2018)
- [6] Mula J., Poler R., Garcia-Sabater J.P., Lario F.C., Models for production planning under uncertainty: A review, Int. J. Prod. Econ, 103, pp. 271-285, (2006)
- [7] Gu J., Jiang T., Zhu H., Zhang C., Low-Carbon Job Shop Scheduling Problem with Discrete Genetic-Grey Wolf Optimization Algorithm, J. Adv. Manuf. Syst, 19, pp. 1-14, (2020)
- [8] Luo S., Zhang L., Fan Y., Energy-efficient scheduling for multi-objective flexible job shops with variable processing speeds by grey wolf optimization, J. Clean. Prod, 234, pp. 1365-1384, (2019)
- [9] Zhu Z., Zhou X., An efficient evolutionary grey wolf optimizer for multi-objective flexible job shop scheduling problem with hierarchical job precedence constraints, Comput. Ind. Eng, 140, (2020)
- [10] Kong X., Yao Y., Yang W., Yang Z., Su J., Solving the Flexible Job Shop Scheduling Problem Using a Discrete Improved Grey Wolf Optimization Algorithm, Machines, 10, (2022)