An Investigation on Construction Project Development Planning Delays in South Africa

被引:1
|
作者
Nyaga Githae, Bedan [1 ]
Hagir, Hakim [1 ]
Alowo, Rebecca [2 ]
机构
[1] Heriot Watt Univ, Sch Energy Geosci Infrastruct & Soc, Edinburgh EH14 4AS, Scotland
[2] Univ Johannesburg, Fac Engn & Built Environm, ZA-2006 Johannesburg, South Africa
关键词
policy; preconstruction; planning; building regulations; delays; government spheres; INDUSTRY;
D O I
10.3390/buildings14092963
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article aims to determine the causes of the delays in South African construction project planning, discussing the centralised hierarchical planning system factors, multiple agencies/spheres of government regarding building-permit approval factors, and systems and spheres of government/multiple agencies for improving preconstruction project planning in South Africa. It also describes a one-stop centre as a framework for improving South African preconstruction planning. The nature of planning in South Africa is influenced by many legislative measures. The delays being experienced in the educational infrastructure project have attributed to the backlogs currently existing in the delivery of basic education infrastructure. This study was conducted using a quantitative research design technique to assess the secondary data findings through primary data gathered on about 106 construction industry operatives. The primary data collected from the 106 construction operatives focused on architects, engineers, surveyors, and contractors. The researchers conducted a pilot survey with experts/professionals before an industry-wide survey as a questionnaire pretest. The finalised questionnaire was used as a data-gathering technique in the quantitative study approach. A focus group discussion was held to validate the findings. The collected information was then subjected to quantitative analysis in SPSS Version: 29.0.2.0 to verify the veracity of the research. According to the findings, a one-stop centre would enhance systems and sectors of government/multiple agencies and prevent preconstruction project-planning delays in South Africa. A centralised hierarchical planning system is essential for reducing preconstruction-planning delays and multiple agencies/sectors of the government delaying building-permit approvals. The critical research contribution is in that expanding on what is already known about preconstruction project planning in South Africa, this study shows how crucial it is to identify and understand the factors that influence preconstruction project planning in that country. The limitation, however, is that, regarding South Africa, the available literature indicates that there is a problem with systems responsible for approving construction projects. In conclusion, by proposing a structure known as the one-stop centre (OSC) to address the issues that lead to delays in preconstruction project planning in South Africa, this study offers a significant contribution.
引用
收藏
页数:23
相关论文
共 50 条
  • [1] On the Liberal Moral Project of Planning in South Africa
    Winkler T.
    Urban Forum, 2011, 22 (2) : 135 - 148
  • [2] Investigation of Project Delays: Towards a Sustainable Construction Industry
    Memon, Aftab Hameed
    Memon, Abdul Qadir
    Khahro, Shabir Hussain
    Javed, Yasir
    SUSTAINABILITY, 2023, 15 (02)
  • [3] A principal component analysis of sustainable building construction features for project delivery in South Africa
    Emere, Chijioke Emmanuel
    Aigbavboa, Clinton Ohis
    Thwala, Wellington Didibhuku
    Akinradewo, Opeoluwa Israel
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2024,
  • [4] A Framework to Integrate Non-profits into Development Planning in South Africa
    Nwauche, Sokeibelemaye
    VOLUNTAS, 2023, 34 (06): : 1134 - 1145
  • [5] A chronographic method for construction project planning
    Francis, Adel
    Miresco, Edmond
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2006, 33 (12) : 1547 - 1557
  • [6] Rural Residents' Perception of Construction Project Delays in Pakistan
    Hussain, Shahid
    Zhu, Fangwei
    Ali, Zaigham
    Xu, Xiaohang
    SUSTAINABILITY, 2017, 9 (11)
  • [7] Urban land reform in South Africa: Pointers for urban policy and planning
    Huchzermeyer, Marie
    Harrison, Philip
    Charlton, Sarah
    Klug, Neil
    Rubin, Margot
    Todes, Alison
    TOWN AND REGIONAL PLANNING, 2019, 75 : 91 - 103
  • [8] Assessment of the Delays in the Delivery of Public Sector Projects in South Africa
    Shivambu, Xitshembiso
    Thwala, Wellington Didibhuku
    INTELLIGENT HUMAN SYSTEMS INTEGRATION 2019, 2019, 903 : 902 - 908
  • [9] Influence of Project and Marketing Management on Delays, Penalties, and Project Quality in Slovene Organizations in the Construction Industry
    Golob, Ksenija
    Bastic, Majda
    Psunder, Igor
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2013, 29 (04) : 495 - 502
  • [10] Investigating the impact of unanticipated market and construction delays on the development of a meshed HVDC grid using dynamic transmission planning
    Torbaghan, Shahab Shariat
    Gibescu, Madeleine
    Rawn, Barry G.
    Muller, Hannah
    Roggenkamp, Martha
    van der Meijden, Mart
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2015, 9 (15) : 2224 - 2233