Optimization Configuration Method of Energy Storage Considering Photovoltaic Power Consumption and Source-Load Uncertainty

被引:1
|
作者
Qiao, Junjie [1 ]
Meng, Xiaofang [1 ]
Zheng, Weigang [2 ]
Huang, Pengxue [1 ]
Xu, Tiefeng [3 ]
Xu, Yupeng [1 ]
机构
[1] Shenyang Agr Univ, Coll Informat & Elect Engn, Shenyang 110866, Peoples R China
[2] State Grid Liaoning Elect Power Co Ltd, Elect Power Sci Res Inst, Shenyang 110006, Peoples R China
[3] Fushun Power Supply Co State Grid, Fushun 113008, Peoples R China
来源
IEEE ACCESS | 2025年 / 13卷
关键词
Energy storage; Voltage; Costs; Uncertainty; Load modeling; Linear programming; Distribution networks; Resource management; Photovoltaic systems; Optimization; Monte Carlo method; distribution network transformer area; source-load uncertainty; photovoltaic consumption; scene analysis;
D O I
10.1109/ACCESS.2025.3528050
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The proposal of a "double carbon" target has resulted in a gradual and continuous increase in the proportion of photovoltaic (PV) access to the distribution network area. To enhance the capability of PV consumption and mitigate the voltage overrun issue stemming from the substantial PV access proportion, this paper presents a multi-objective energy storage optimization allocation methodology. Firstly, a PV and load uncertainty model is established based on Beta and Normal distributions, and the Monte Carlo Method (MC) is used to simulate the annual output. The representative scenarios are obtained after the combination is cut down by the K-means clustering algorithm. The poor operation scenarios are identified by using the variation of the maximum total node voltage deviation. Finally, an energy storage optimization allocation is proposed. Subsequently, the objective function, which seeks to minimize the total daily operating cost of the energy storage system and the PV abandonment rate, is constructed using the evaluation-based function method. The constraints, including node voltage and energy storage device, are considered, and the model is solved using the improved grey wolf optimization algorithm. Finally, a distribution network station system is employed to compare and analyze the capacity allocation results of poor operation scenarios under different schemes, the results showed that after energy storage optimization, the voltage of each scheme decreased from 0.4869kV to 0.42kV, and the curtailment rate decreased by 13.09%, 21.33%, and 23.69% respectively compared to before optimization,which verifies the effectiveness of the models and methods proposed in this paper.
引用
收藏
页码:9401 / 9412
页数:12
相关论文
共 50 条
  • [21] Over-limit risk assessment method of integrated energy system considering source-load correlation
    Wang, Ying
    Wang, Xiaojun
    Zhang, Yizhi
    Zhang, Yigang
    Xu, Zekai
    GLOBAL ENERGY INTERCONNECTION-CHINA, 2023, 6 (06): : 661 - 674
  • [22] Optimization Configuration of Wind Photovoltaic Hydrogen Storage System Capacity Considering Load Distribution
    Wu, Xiaofeng
    Liu, Guozhong
    Huang, Zhicong
    2024 THE 7TH INTERNATIONAL CONFERENCE ON ENERGY, ELECTRICAL AND POWER ENGINEERING, CEEPE 2024, 2024, : 962 - 968
  • [23] Comprehensive evaluation of fault severity considering source-load power uncertainty from multiple spatiotemporal perspectives
    Wu Y.
    Luo Y.
    Zhou S.
    Tang M.
    Lei C.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2023, 43 (04): : 192 - 200
  • [24] W-S-C Capture Coordination in Virtual Power Plant Considering Source-load Uncertainty
    Zhong W.
    Huang S.
    Cui Y.
    Xu J.
    Zhao Y.
    Dianwang Jishu/Power System Technology, 2020, 44 (09): : 3424 - 3432
  • [25] Robust Optimization Configuration for Energy Storage System Capacity Considering Uncertainty of Disturbance
    Cao, Yongji
    Zhang, Hengxu
    Li, Changgang
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2024, 48 (19): : 139 - 147
  • [26] Configuration Method of Energy Storage for Wind Farms Considering Wind Power Uncertainty and Wind Curtailment Constraint
    Yang L.
    Cao Y.
    Wei W.
    Chen L.
    Mei S.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2020, 44 (16): : 45 - 52
  • [27] Research on Power Grid Planning Method Considering the Uncertainty of Source and Load
    Peng, Dong
    Zhao, Lang
    Li, Yizheng
    Xue, Yawei
    Wang, Xueying
    THIRD INTERNATIONAL CONFERENCE ON ELECTRONICS AND COMMUNICATION; NETWORK AND COMPUTER TECHNOLOGY (ECNCT 2021), 2022, 12167
  • [28] Battery Energy Storage System Planning Based on Super-Resolution Source-Load Uncertainty Reconstruction
    Wang, Qian
    Zhang, Xueguang
    Xu, Dianguo
    IEEE TRANSACTIONS ON SMART GRID, 2024, 15 (01) : 581 - 594
  • [29] Sequential Optimization Configuration Method for Power Quality Monitors Considering Photovoltaic Access
    Liang, Xiaorui
    Zhong, Qiming
    Zhang, Huaying
    Wang, Ying
    Liu, Huicong
    IEEE ACCESS, 2024, 12 : 190310 - 190321
  • [30] Probabilistic multi-energy flow calculation method for integrated heat and electricity systems considering correlation of source-load power
    Jiang, Hui
    Yang, Peihong
    Liu, Chunming
    Kang, Lan
    Zhang, Xiaoming
    Zhang, Zilei
    Fan, Pengxiang
    ENERGY REPORTS, 2023, 9 : 1651 - 1667