Applying an Adaptation of the Prado Project Management Maturity Model in an Academic Context

被引:0
作者
Araujo, Ana [1 ]
Ribeiro, Pedro [1 ]
机构
[1] Univ Minho, Ctr ALGORITMI, Dept Informat Syst, P-4804533 Guimaraes, Portugal
来源
TRENDS AND APPLICATIONS IN INFORMATION SYSTEMS AND TECHNOLOGIES, VOL 3 | 2021年 / 1367卷
关键词
Project management; Maturity models; Project management maturity models;
D O I
10.1007/978-3-030-72660-7_34
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The organization's strategy of a company is determinant in its performance. The need to develop methodologies to evaluate the performance of projects in organizations has a strong contribution to the development of maturity models. The lack of knowledge of these maturity models causes organizations to experience problems in the development and improvement of their project management processes. The main objective of this article is to adapt and apply a maturity model to assess the evolution of the maturity of project management practices in development teams in an academic environment. The Prado Project Management Maturity Model was applied to the project teams of the curricular subjects Development of Computer Applications of the second academic year and Information Systems and Technologies Project of the fourth academic year of the Integrated Masters in Engineering and Management of Information Systems course at the University of Minho. Through the application of the model, it was possible to compare the maturity between the two curricular units and to verify the effectiveness of the learning methods and strategies, and results in project management competencies throughout the course.
引用
收藏
页码:350 / 359
页数:10
相关论文
共 17 条
  • [1] Amorim C., 2009, O impacto do CMM / CMMI na qualidade do S/w: um estudo sobre a percecao dos profissionais de TIC, V119
  • [2] [Anonymous], 1997, The Qualitative Report
  • [3] Becker J., 2009, Becker2009ArticleDevelopingMaturityModelsForITM.pdf
  • [4] Project management of life-science research projects: project characteristics, challenges and training needs
    Beukers, Margot W.
    [J]. DRUG DISCOVERY TODAY, 2011, 16 (3-4) : 93 - 98
  • [5] De M., 2013, American Journal of Educational Research, V1, P391, DOI DOI 10.12691/EDUCATION-1-9-7
  • [6] Assessment of Maturity in Project Management: A Bibliometric Study of Main Models
    de Souza, Talita Ferreira
    Simoes Gomes, Carlos Francisco
    [J]. 3RD INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND QUANTITATIVE MANAGEMENT, ITQM 2015, 2015, 55 : 92 - 101
  • [7] Freitas W.R.S., 2011, Utilizando estudo de caso(s) como estrategia de pesquisa qualitativa: boas praticas e sugestoes, V18, P16
  • [8] Selection priority of process areas based on CMMI continuous representation
    Huang, SJ
    Han, WM
    [J]. INFORMATION & MANAGEMENT, 2006, 43 (03) : 297 - 307
  • [9] Kerzner H., Strategic planning for a project office, DOI [10.1177/875697280303400203, DOI 10.1177/875697280303400203]
  • [10] Murray-Webster R., 2019, APM Body of Knowledge, V7th