Discrete Random Renewable Replacements after the Expiration of Collaborative Preventive Maintenance Warranty

被引:0
|
作者
Chen, Hui [1 ]
Chen, Jie [1 ]
Lai, Yangyang [1 ]
Yu, Xiaoqi [1 ]
Shang, Lijun [1 ]
Peng, Rui [2 ]
Liu, Baoliang [3 ]
机构
[1] Foshan Univ, Sch Management, Foshan 528225, Peoples R China
[2] Beijing Univ Technol, Sch Econ & Management, Beijing 100124, Peoples R China
[3] Shanxi Datong Univ, Coll Math & Stat, Datong 037009, Peoples R China
基金
中国国家自然科学基金;
关键词
mission cycle; warranty; repair-time threshold; back replacement; front replacement; PRODUCTION RUN-LENGTH; AVAILABILITY ANALYSIS; SYSTEMS SUBJECT; TIME; PRODUCT; POLICY; COST; MANAGEMENT; STRATEGY;
D O I
10.3390/math12182845
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
With advanced digital technologies as the key support, many scholars and researchers have proposed various random warranty models by integrating mission cycles into the warranty stage. However, these existing warranty models are designed only from the manufacturer's subjective perspective, ignoring certain consumer requirements. For instance, they overlook a wide range of warranty coverage, the pursuit of reliability improvement rather than mere minimal repair, and the need to limit the delay in repair. To address these consumer requirements, this paper proposes a novel random collaborative preventive maintenance warranty with repair-time threshold (RCPMW-RTT). This model incorporates terms that are jointly designed by manufacturers and consumers to meet specific consumer needs, thereby overcoming the limitations of existing warranty models. The introduction of a repair-time threshold aims to limit the time delay in repairing failures and to compensate for any losses incurred by consumers. Using probability theory, the RCPMW-RTT is evaluated in terms of cost and time, and relevant variants are derived by analyzing key parameters. As an exemplary representation of the RCPMW-RTT, two random replacement policies named the discrete random renewable back replacement (DRRBR) and the discrete random renewable front replacement (DRRFR) are proposed and modelled to ensure reliability after the expiration of the RCPMW-RTT. In both policies, product replacement is triggered either by the occurrence of the first extreme mission cycle or by reaching the limit on the number of non-extreme mission cycles, whichever comes first. Probability theory is used to present cost rates for both policies in order to determine optimal values for decision variables. Finally, numerical analysis is performed on the RCPMW-RTT to reveal hidden variation tendencies and mechanisms; numerical analysis is also performed on the DRRBR and the DRRFR. The numerical results show that the proposed random replacement policies are feasible and unique; the replacement time within the post-warranty coverage increases as the maintenance quality improves and the cost rate can be reduced by setting a smaller repair-time threshold.
引用
收藏
页数:21
相关论文
共 6 条
  • [1] Customized Random Maintenance Policies After the Expiration of a Renewal Repair-Replacement Warranty with Random Charge
    Zhao, Lin
    Shang, Lijun
    Liu, Baoliang
    MATHEMATICS, 2025, 13 (01)
  • [2] Warranty and discrete preventive maintenance
    Kim, CS
    Djamaludin, I
    Murthy, DNP
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2004, 84 (03) : 301 - 309
  • [3] Random renewable replacements to manage product reliability through a random renewable repair warranty
    Shang, Lijun
    Wang, Liying
    Shang, Guojun
    Cai, Zhiqiang
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2025, 27 (01):
  • [4] Optimization of Renewable Warranty by Considering System Reliability and Preventive Maintenance and Repairs
    Chaimankong, Benjarut
    Chetthamrongchai, Paitoon
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2022, 21 (02): : 390 - 400
  • [5] Designing random collaborative warranty and customizing maintenance strategies for systems subject to mission cycles
    Shang, Lijun
    Liu, Baoliang
    Peng, Rui
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2025, 257
  • [6] Optimization of periodic preventive maintenance policy following the expiration of two-dimensional warranty
    Park, Minjae
    Jung, Ki Mun
    Park, Dong Ho
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2018, 170 : 1 - 9