An Improved Marriage in Honey-Bee Optimization Algorithm for Minimizing Earliness/Tardiness Penalties in Single-Machine Scheduling with a Restrictive Common Due Date

被引:1
作者
Palominos, Pedro [1 ]
Mazo, Mauricio [1 ]
Fuertes, Guillermo [2 ]
Alfaro, Miguel [1 ]
机构
[1] Univ Santiago Chile, Ind Engn Dept, Ave Victor Jara 3769, Santiago 9170124, Chile
[2] Univ Bernardo OHiggins, Fac Ingn Ciencia & Tecnol, Ave Viel 1497,Ruta 5, Santiago 8370993, Chile
关键词
scheduling; production planning; just-in-time; MBO algorithm; SMWE; 68-XX; TARDINESS PENALTIES; EARLINESS; ASSIGNMENT; SEARCH;
D O I
10.3390/math13030418
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
This study evaluates the efficiency of a swarm intelligence algorithm called marriage in honey-bee optimization (MBO) in solving the single-machine weighted earliness/tardiness problem, a type of NP-hard combinatorial optimization problem. The goal is to find the optimal sequence for completing a set of tasks on a single machine, minimizing the total penalty incurred for tasks being completed too early or too late compared to their deadlines. To achieve this goal, the study adapts the MBO metaheuristic by introducing modifications to optimize the objective function and produce high-quality solutions within reasonable execution times. The novelty of this work lies in the application of MBO to the single-machine weighted earliness/tardiness problem, an approach previously unexplored in this context. MBO was evaluated using the test problem set from Biskup and Feldmann. It achieved an average improvement of 1.03% across 280 problems, surpassing upper bounds in 141 cases (50.35%) and matching or exceeding them in 193 cases (68.93%). In the most constrained problems (h = 0.2 and h = 0.4), the method achieved an average improvement of 3.77%, while for h = 0.6 and h = 0.8, the average error was 1.72%. Compared to other metaheuristics, MBO demonstrated competitiveness, with a maximum error of 1.12%. Overall, MBO exhibited strong competitiveness, delivering significant improvements and high efficiency in the problems studied.
引用
收藏
页数:29
相关论文
共 67 条
[1]  
Abbass H.A., 2001, P GEN EV COMP C GECC, P807
[2]  
Abbass HA, 2001, IEEE C EVOL COMPUTAT, P207, DOI 10.1109/CEC.2001.934391
[3]   Honey-bee mating optimization (HBMO) algorithm for optimal reservoir operation [J].
Afshar, A. ;
Bozorg-Haddad, Omid ;
Marino, M. A. ;
Adams, B. J. .
JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 2007, 344 (05) :452-462
[4]   Discrete hybrid cuckoo search and simulated annealing algorithm for solving the job shop scheduling problem [J].
Alkhateeb, Faisal ;
Abed-alguni, Bilal H. ;
Al-rousan, Mohammad Hani .
JOURNAL OF SUPERCOMPUTING, 2022, 78 (04) :4799-4826
[5]   A Hybrid Cuckoo Search and Simulated Annealing Algorithm [J].
Alkhateeb, Faisal ;
Abed-alguni, Bilal H. .
JOURNAL OF INTELLIGENT SYSTEMS, 2019, 28 (04) :683-698
[6]   Hybrid metaheuristic technique for optimal container resource allocation in cloud [J].
Alotaibi, Majid .
COMPUTER COMMUNICATIONS, 2022, 191 :477-485
[7]  
[Anonymous], 2001, P INT C COMP INT MOD
[8]   Optimal policies for minimizing total job completion times and deviations from common due dates in unrelated parallel machine scheduling [J].
Arik, Oguzhan Ahmet .
OPSEARCH, 2024, 61 (03) :1654-1680
[9]   A heuristic for single machine common due date assignment problem with different earliness/tardiness weights [J].
Arik, Oguzhan Ahmet .
OPSEARCH, 2023, 60 (03) :1561-1574
[10]   Weighted earliness/tardiness parallel machine scheduling problem with a common due date [J].
Arik, Oguzhan Ahmet ;
Schutten, Marco ;
Topan, Engin .
EXPERT SYSTEMS WITH APPLICATIONS, 2022, 187