Dynamic Analysis and Temporal Governance of Safety Risks: Evidence from Underground Construction Accident Reports

被引:0
作者
Wu, Xiuyu [1 ]
Sun, Pengkai [2 ]
机构
[1] Tianjin Univ Finance & Econ, Sch Management Sci & Engn, Tianjin 300222, Peoples R China
[2] Nanjing Normal Univ, Sch Business, Nanjing 210023, Peoples R China
关键词
underground construction safety risk; multi-actor; dynamic configuration analysis; temporal management; METRO CONSTRUCTION; SYSTEM DYNAMICS; MANAGEMENT; IDENTIFICATION; PROJECTS; MODEL;
D O I
10.3390/su16198531
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Due to the complexity and dynamics of underground construction projects, safety risk management has experienced significant challenges restricting the sustainable development of underground space. The research on risk causal chains and risk coupling has yet to reveal the dynamic interactive characteristics of these risk factors and their temporal relationships over time. This study utilized a complex system view for safety risk analysis, using 37 accident investigation reports of underground construction projects. Combined with two novel and emerging analytical methods, temporal qualitative comparative analysis and crisp-set qualitative comparative analysis, this study discusses the temporal relationship of risk factors to the cause of accidents and explores the multi-actor coupling characteristics of management risk. The findings indicate that (1) compared with general construction projects, underground construction should pay more attention to management safety risks because they have an obvious time lag effect expressed in all accident causation paths, namely, preceding management risk, management risk, and machine/material risk cross-concurrently, and management risk initiation and (2) underground construction project management risks have three key main paths, namely, single-actor-dominated management deficiency (supervisors, owners, and subcontractors that cause management risks as a single-core actor) and dual-actor-dominated management deficiency (owner and subcontractor as dual core actors of management risk). Multi-actor-dominated management deficiency (owners, subcontractors, and supervisors are the multiple core actors of management risk). This study thus developed a temporal governance framework of underground construction safety risks based on the synergy of multi-actors and proposed risk governance strategies, such as synergistic multi-actor governance, to consider the temporal relationship of safety risk. This study further reveals the temporal and coupling characteristics of safety risks to enrich the risk casual chain theory and risk coupling theory and establish a systematic risk analysis framework for new guidance for safety and risk management for underground construction projects.
引用
收藏
页数:24
相关论文
共 65 条
[1]   Mainstreaming sustainable development into a city's Master plan: A case of Urban Underground Space use [J].
Bobylev, Nikolai .
LAND USE POLICY, 2009, 26 (04) :1128-1137
[2]   TQCA - A technique for adding temporality to qualitative comparative analysis [J].
Caren, N ;
Panofsky, A .
SOCIOLOGICAL METHODS & RESEARCH, 2005, 34 (02) :147-172
[3]   Poverty alleviation through e-commerce: Village involvement and demonstration policies in rural China [J].
Chao, Peng ;
Biao, Ma ;
Chen, Zhang .
JOURNAL OF INTEGRATIVE AGRICULTURE, 2021, 20 (04) :998-1011
[4]   Influence of Interpersonal and Institutional Trust on the Participation Willingness of Farmers in E-Commerce Poverty Alleviation [J].
Chen, Guoyi ;
Tan, Wei ;
Zhang, Shangmin ;
Yan, Bangquan .
FRONTIERS IN PSYCHOLOGY, 2021, 12
[5]   Identification of core risk factors and risk diffusion effect of urban underground engineering in China: A social network analysis [J].
Chen, Wenqiang ;
Deng, Jiaojiao ;
Niu, Lianchao .
SAFETY SCIENCE, 2022, 147
[6]  
[程聪 Cheng Cong], 2019, [科研管理, Science Research Management], V40, P111
[7]   Evolution model and quantitative assessment of risk network in housing construction accidents [J].
Cheng, Lianhua ;
Cao, Dongqiang .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (01) :227-246
[8]   Temporal Visual Patterns of Construction Hazard Recognition Strategies [J].
Cheng, Rui ;
Wang, Jiaming ;
Liao, Pin-Chao .
INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2021, 18 (16)
[9]   Accident risk identification and its impact analyses for strategic construction safety management [J].
Chi, Seokho ;
Han, Sangwon ;
Kim, Dae Young ;
Shin, Yoonjung .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (04) :524-538
[10]   Analyses of systems theory for construction accident prevention with specific reference to OSHA accident reports [J].
Chi, Seokho ;
Han, Sangwon .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (07) :1027-1041