A real-time bi-level path planning approach for the conflict-free routing problem of multi-AGV systems

被引:0
|
作者
Luo, Zhuojun [1 ]
Liu, Dameng [2 ]
Yang, Weiyong [1 ]
Feng, Shiquan [1 ]
Wen, Zhe [1 ]
机构
[1] Jihua Lab, Foshan, Peoples R China
[2] Tsinghua Univ, State Key Lab Tribol Adv Equipment, Beijing 100084, Peoples R China
关键词
Automated guided vehicles; bi-level path planning; A* algorithm; traffic control; Petri net; NET DECOMPOSITION APPROACH; DEADLOCK; PREVENTION;
D O I
10.1177/09544054241305824
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A real-time bi-level path planning approach is proposed to address the conflict-free routing problem of multi-AGV systems. At the static path planning level, an enhanced A* algorithm is proposed, which considers risks of different types of conflicts as path searching costs, in order to minimize conflicts during path searching. At the dynamic traffic control level, Petri net based traffic controllers are designed for dynamic traffic management on conflicting nodes and arcs to prevent AGV collisions. Computational test results demonstrate that the improved A* algorithm can significantly reduce preplanned path conflicts. The Petri net based traffic controllers are able to effectively guide AGVs to avoid collisions when conflicts arise. The computational times for both levels are within milliseconds, which is crucial for real-time applications.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] A Bi-Level Path Planning Algorithm for Multi-AGV Routing Problem
    Yuan, Zhiheng
    Yang, Zhengmao
    Lv, Lingling
    Shi, Yanjun
    ELECTRONICS, 2020, 9 (09) : 1 - 16
  • [2] Real-Time Conflict-Free Task Assignment and Path Planning of Multi-AGV System in Intelligent Warehousing
    Zhang, Wenbo
    Peng, Yonggang
    Wei, Wei
    Kou, Liwei
    2018 37TH CHINESE CONTROL CONFERENCE (CCC), 2018, : 5311 - 5316
  • [3] Conflict-free Real-time AGV Routing
    Moehring, Rolf H.
    Koehler, Ekkehard
    Gawrilow, Ewgenij
    Stenzel, Bjoern
    OPERATIONS RESEARCH PROCEEDINGS 2004, 2005, : 18 - 24
  • [4] Optimized Simultaneous Conflict-Free Task Assignment and Path Planning for Multi-AGV Systems
    Sabattini, Lorenzo
    Digani, Valerio
    Secchi, Cristian
    Fantuzzi, Cesare
    2017 IEEE/RSJ INTERNATIONAL CONFERENCE ON INTELLIGENT ROBOTS AND SYSTEMS (IROS), 2017, : 1083 - 1088
  • [5] Multi-AGV scheduling for conflict-free path planning in automated container terminals
    Zhong, Meisu
    Yang, Yongsheng
    Dessouky, Yasser
    Postolache, Octavian
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 142
  • [6] A Distributed Conflict-Free Task Allocation Method for Multi-AGV Systems
    Guo, Qiang
    Yao, Haiyan
    Liu, Yi
    Tang, Zhipeng
    Zhang, Xufeng
    Li, Ning
    ELECTRONICS, 2023, 12 (18)
  • [7] A System Control Strategy of a Conflict-free Multi-AGV Routing based on Improved A* Algorithm
    Jia, Fang
    Ren, Chenglong
    Chen, Yi
    Xu, Zhixiang
    2017 24TH INTERNATIONAL CONFERENCE ON MECHATRONICS AND MACHINE VISION IN PRACTICE (M2VIP), 2017, : 199 - 204
  • [8] Petri Net Decomposition Approach for Bi-objective Conflict-free Routing for AGV Systems
    Eda, Shuhei
    Nishi, Tatsushi
    Mariyama, Toshisada
    Kataoka, Satomi
    Shoda, Kazuya
    Matsumura, Katsuhiko
    2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 820 - 825
  • [9] Random Search for Dispatch and Conflict-Free Routing Problem of Capacitated AGV Systems
    Miyamoto, Toshiyuki
    Inoue, Kensuke
    2013 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC 2013), 2013, : 1611 - 1615
  • [10] Recovering feasibility in real-time conflict-free vehicle routing
    Adamo, Tommaso
    Ghiani, Gianpaolo
    Guerriero, Emanuela
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 183