Asset Management for the ELT

被引:0
作者
Egner, Sebastien [1 ]
Hamilton, Rob [1 ]
Gago, Fernando [1 ]
Guzman, Ronald [1 ]
Gonzalez, Sergio [1 ]
Serrano, Dario [1 ]
Escarlate, Nathalia [1 ]
Gnatz, Amelie [1 ]
Gonzalez, Javier [1 ]
Herrera, Juan-Carlos Gonzalez [1 ]
Kurlandczyk, Herve [1 ]
Jaeger, Matias [1 ]
Montironi, Katia [1 ]
Morales, Alex [1 ]
Phillips, Judith [1 ]
Siclari, Waldo [1 ]
机构
[1] European Southern Observ, Karl Schwarzschild Str 2, D-85748 Garching, Germany
来源
MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY XI, PT 1 | 2024年 / 13099卷
关键词
Asset Management; Configuration Management; Logistics;
D O I
10.1117/12.3020033
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
The construction of the ELT is now in full swing. This is true both for the construction of the Dome and Main Structure (DMS) in Chile, but also for all the other sub-systems manufactured by industrial partners in Europe. While the DMS is entirely managed by the industrial consortium, the shipment to Chile and the installation at the telescope of the other subsystems is mostly under the responsibility of ESO. The shipment of these components from Europe to Chile has started recently and will soon reach a level of similar to 10'000 components/month. All these components will need to be tracked during their shipment, incoming inspections will need to be performed, health-checks and integration with other components will need to be done. The components will then be stored temporarily at the warehouse, before being installed at the telescope. We will present the approach for the logistics, infrastructure, and the tools set up to manage the status and location of all these components and to keep the link to their associated latest documentation.
引用
收藏
页数:6
相关论文
共 5 条
[1]  
Egner S., 2024, SPIE, V13099-24
[2]  
Ferreira B., 2024, ESO Announcement: First segments of world's largest telescope mirror have a shiny new surface
[3]  
Ferreira B., 2023, ESO Press Release
[4]  
Martinez P., 2024, SPIE, V13094-5
[5]  
Tamai R., 2024, SPIE, V13094-43