Data Augmentation Approaches for Estimating Curtain Wall Construction Duration in High-Rise Buildings

被引:0
作者
Park, Sang-Jun [1 ]
Im, Jin-Bin [1 ]
Yoon, Hye-Soon [2 ]
Kim, Ju-Hyung [1 ]
机构
[1] Hanyang Univ, Dept Architectural Engn, Sci & Technol Hall,222 Wangsimni Ro, Seoul 04763, South Korea
[2] Kunwon Engn Co Ltd, 167 Songpa Daero, Seoul 05840, South Korea
关键词
data augmentation; insufficient data; high-rise buildings; curtain wall construction; duration estimation; MODEL; INSTALLATION; PERFORMANCE; PREDICTION; PROJECTS; DESIGN;
D O I
10.3390/buildings15040583
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Reliable project management during planning stages of a building project is a meticulous process typically requiring sufficient precedencies. Typical construction duration estimation is based on previous cases of similar projects used to validate construction duration proposals from contractors, plan overall project duration, and set a standard for project success or failure. In cases of high-rise buildings exceeding 200 m, insufficient data commonly arise from the rarity of such projects, leading to a rough estimation of construction duration. Therefore, in this study, oversampling and data augmentation techniques derived from engineering principles, such as parametric optimization and data imbalance problems, are explored for curtain wall construction for high-rise buildings. The study was conducted in two phases. First, oversampling and data augmentation techniques, including Latin Hypercube, optimal Latin Hypercube, simple Monte Carlo, descriptive Monte Carlo, Sobol Monte Carlo, synthetic minority oversampling technique (SMOTE), and SMOTE-Tomek, were applied to 15 raw datasets collected from previous projects. The dataset was split into 8:2 for training and testing, where the mentioned techniques were applied to generate 500 virtual samples from the training data. Second, support vector regression was applied to forecast construction duration, where statistical performance criteria were applied for evaluation. The results showed that SMOTE and SMOTE-Tomek best represented the original dataset based on box plot analysis showcasing data distribution. Moreover, according to statistical performance criteria, it was found that the oversampling techniques improved the prediction performance, where Pearson correlation for linear, polynomial, and RBF increased by 0.611%, 4.232%, and 0.594%, respectively, for the best-performing sampling method. Finally, for the prediction models, probabilistic oversampling methods outperformed other methods according to the statistical performance criteria.
引用
收藏
页数:21
相关论文
共 76 条
  • [1] Jin R., Han S., Hyun C., Cha Y., Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects, J. Constr. Eng. Manag, 142, (2015)
  • [2] Li M., Wang G., Cao D., Sun J., Jia G., Construction Duration Estimation for Airport Terminals in China: Case-Based Reasoning Model Considering Case Retrieval Methods and Case Retention Strategies, J. Constr. Eng. Manag, 149, (2023)
  • [3] Nani G., Mensah I., Adjei-Kumi T., Duration Estimation Model for Bridge Construction Projects in Ghana, J. Eng. Des. Technol, 15, pp. 754-777, (2017)
  • [4] Scholkopf B., Smola A.J., Learning with Kernels: Support Vector Machines, Regularization, Optimization, and Beyond, (2018)
  • [5] Zhang S., Li X., A Comparative Study of Machine Learning Regression Models for Predicting Construction Duration, J. Asian Archit. Build. Eng, 23, pp. 1980-1996, (2023)
  • [6] Han S., Ko Y.H., Hong T., Koo C., Lee S., Framework for the Validation of Simulation-Based Productivity Analysis: Focused on Curtain Wall Construction Process, J. Civ. Eng. Manag, 23, pp. 163-172, (2017)
  • [7] Nguyen L.D., Phan D.H., Tang L.C.M., Simulating Construction Duration for Multistory Buildings with Controlling Activities, J. Constr. Eng. Manag, 139, pp. 951-959, (2013)
  • [8] Lee H.-S., Shin J.-W., Park M., Ryu H.-G., Probabilistic Duration Estimation Model for High-Rise Structural Work, J. Constr. Eng. Manag, 135, pp. 1289-1298, (2009)
  • [9] Li Y., Lu K., Lu Y., Project Schedule Forecasting for Skyscrapers, J. Manag. Eng, 33, (2016)
  • [10] Szolomicki J., Golasz-Szolomicka H., Technological Advances and Trends in Modern High-Rise Buildings, Buildings, 9, (2019)