共 50 条
- [33] Development of Integrated Model For Continuous Berth Allocation Problem and Quay Crane Scheduling With Non Crossing Constraint STATISTICS AND OPERATIONAL RESEARCH INTERNATIONAL CONFERENCE (SORIC 2013), 2014, 1613 : 113 - 121
- [34] A Robust Scheduling Model for Continuous Berth Allocation Problem under Uncertainty 2020 5TH INTERNATIONAL CONFERENCE ON ELECTROMECHANICAL CONTROL TECHNOLOGY AND TRANSPORTATION (ICECTT 2020), 2020, : 43 - 49
- [36] Optimization of continuous berth and quay crane allocation problem in seaport container terminal Int. Conf. Intelligent Comput. Technol. Autom., ICICTA, 1600, (229-233):
- [37] Optimization of continuous berth and quay crane allocation problem in seaport container terminal ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL III, PROCEEDINGS, 2009, : 229 - 233
- [38] A two-stage composite heuristic for dual cycling quay crane scheduling problem 2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 1902 - 1907
- [39] Integrated Waterway Scheduling, Berth Allocation and Quay Crane Assignment Problem by Using a Hybrid Flow Shop Concept PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 243 - 247