Joint Optimization of Preventive Replacement and Spare Part Ordering for Single-Unit Systems With Mixed Inspections

被引:0
作者
Liu, Yongchao [1 ]
Wang, Guanjun [1 ]
Liu, Peng [1 ]
机构
[1] Southeast Univ, Sch Math, Nanjing, Peoples R China
关键词
average availability; average cost rate; mean time to failure; preventive replacement; spare part ordering; INVENTORY SYSTEM; POLICIES; TIME; MODEL;
D O I
10.1002/qre.3701
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper introduces a unified policy for preventive replacement and spare parts ordering for systems whose degradation follows a gamma process. It considers N$N$ types of orders, each with variable lead times, and employs a combined inspection approach that integrates sequential and opportunistic inspections to monitor the system condition. The proposed policy coordinates the scheduling of spare parts orders, preventive replacements, and inspections based on the current state of the system. To assess its performance, the renewal reward theorem is used to calculate the average cost rate, the average availability, and the mean time to the first failure. The objective is to minimize the average cost rate, achieved through a grid search algorithm that identifies the optimal inspection and ordering policy. The effectiveness of the proposed policy is further validated by comparing its performance with three other policies in existing research works.
引用
收藏
页码:919 / 932
页数:14
相关论文
共 15 条
  • [1] Joint optimization of inspection-based and age-based preventive maintenance and spare ordering policies for single-unit systems
    Ma Weining
    Zhao Fei
    Li Xin
    Hu Qiwei
    Shang Bingcong
    [J]. JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2022, 33 (05) : 1268 - 1280
  • [2] Joint optimization of spare parts ordering and age-based preventive replacement
    Panagiotidou, Sofia
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (20) : 6283 - 6299
  • [3] Joint Optimization of Spare Ordering and Preventive Replacement Policy Based on RUL
    Zhao, Fei
    Zhang, Yu
    Liu, Xuejuan
    [J]. 2019 PROGNOSTICS AND SYSTEM HEALTH MANAGEMENT CONFERENCE (PHM-QINGDAO), 2019,
  • [4] Joint optimization of preventive replacement and periodic review spare part provisioning policy with used items
    Zhang, J
    Tian, ZG
    Li, XH
    Zuo, MJ
    [J]. PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN THE GLOBAL ECONOMY, 2005, : 878 - 882
  • [5] Joint optimization of preventive maintenance and inventory policies for multi-unit systems subject to deteriorating spare part inventory
    Jiang, Yunpeng
    Chen, Maoyin
    Zhou, Donghua
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2015, 35 : 191 - 205
  • [6] JOINT OPTIMIZATION OF REPLACEMENT AND SPARE ORDERING FOR CRITICAL ROTARY COMPONENT BASED ON CONDITION SIGNAL TO DATE
    Chen, Xiaohui
    Xu, Dawei
    Xiao, Lei
    [J]. EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2017, 19 (01): : 76 - 85
  • [7] A Joint Inspection-Based Preventive Maintenance and Spare Ordering Optimization Policy Using a Three-Stage Failure Process
    Zhao, Fei
    Xie, Fengfeng
    Shi, Chenghua
    Kang, Jianshe
    [J]. COMPLEXITY, 2017,
  • [8] Preventive maintenance policy of single-unit systems based on shot-noise process
    Qiu, Qingan
    Cui, Lirong
    Dong, Qinglai
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2019, 35 (02) : 550 - 560
  • [9] Optimization of Joint Policy of Condition-Based Maintenance and Spare Part Ordering Considering Imperfect Maintenance
    Zhao F.
    Li X.
    Guo M.
    [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 2022, 43 (10): : 1413 - 1421
  • [10] Joint Optimization of Preventive Maintenance, Spare Parts Inventory and Transportation Options for Systems of Geographically Distributed Assets
    Wang, Keren
    Djurdjanovic, Dragan
    [J]. MACHINES, 2018, 6 (04)