Knowledge-enhanced multidimensional estimation of distribution hyper-heuristic evolutionary algorithm for semiconductor final testing scheduling problem

被引:0
作者
Zhang, Zi-Qi [1 ,2 ,3 ]
Qiu, Xing-Han [1 ,2 ]
Qian, Bin [1 ,2 ,3 ]
Hu, Rong [1 ,2 ]
Wang, Ling [4 ]
Yang, Jian-Bo [5 ]
机构
[1] Kunming Univ Sci & Technol, Sch Informat Engn & Automat, Kunming 650500, Peoples R China
[2] Kunming Univ Sci & Technol, Higher Educ Key Lab Ind Intelligence & Syst Yunnan, Kunming 650500, Peoples R China
[3] Kunming Univ Sci & Technol, Yunnan Key Lab Artificial Intelligence, Kunming 650500, Peoples R China
[4] Tsinghua Univ, Dept Automat, Beijing 100084, Peoples R China
[5] Univ Manchester, Alliance Manchester Business Sch, Manchester M15 6PB, England
基金
中国国家自然科学基金;
关键词
MEDA; Hyper-heuristic; Semiconductor final testing; High-level strategy; Low-level heuristic; OPTIMIZATION ALGORITHM; TEST OPERATIONS; SEARCH; FACILITY;
D O I
10.1016/j.eswa.2024.125424
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The semiconductor final test scheduling problem (SFTSP), recognized as a crucial bottleneck in the semiconductor production process, holds immense significance for improving both quality control and scheduling efficiency within chip and integrated circuit enterprises. This article introduces the knowledge-enhanced multidimensional estimation of distribution hyper-heuristic evolutionary algorithm (KMEDHEA) for addressing the SFTSP with the aim of minimizing the makespan. First, a single-vector encoding scheme is used to represent feasible solutions, and a problem-specific constrained-separable left-shift decoding scheme is devised to transform these solutions into feasible scheduling schedules. Second, eight simple yet effective heuristics with problem-specific knowledge are developed that served as a suite of low-level heuristics (LLHs) for exploring the problem solution space. Third, the multidimensional estimation of distribution algorithm (MEDA) is employed as the high-level strategy to estimate the correlations and connections of the pre-designed LLHs, thereby guiding the search scope towards high-quality individuals. Finally, critical configurations of parameters are systematically analyzed by conducting a design-of-experiment (DOE) approach. Numerical experiments are conducted on wellknown benchmark datasets, and the experimental results demonstrate the superiority of the KMEDHEA versus several state-of-the-art approaches. The best-known solutions are updated for nine out of ten benchmark instances, highlighting the effectiveness and efficiency of the proposed KMEDHEA in solving the SFTSP.
引用
收藏
页数:28
相关论文
共 60 条
  • [1] A tensor based hyper-heuristic for nurse rostering
    Asta, Shahriar
    Ozcan, Ender
    Curtois, Tim
    [J]. KNOWLEDGE-BASED SYSTEMS, 2016, 98 : 185 - 199
  • [2] Automated Design of Production Scheduling Heuristics: A Review
    Branke, Juergen
    Su Nguyen
    Pickardt, Christoph W.
    Zhang, Mengjie
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2016, 20 (01) : 110 - 124
  • [3] Hyper-heuristics: a survey of the state of the art
    Burke, Edmund K.
    Gendreau, Michel
    Hyde, Matthew
    Kendall, Graham
    Ochoa, Gabriela
    Oezcan, Ender
    Qu, Rong
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (12) : 1695 - 1724
  • [4] Scheduling Semiconductor Testing Facility by Using Cuckoo Search Algorithm With Reinforcement Learning and Surrogate Modeling
    Cao, ZhengCai
    Lin, ChengRan
    Zhou, MengChu
    Huang, Ran
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2019, 16 (02) : 825 - 837
  • [5] A two-stage genetic programming framework for Stochastic Resource Constrained Multi-Project Scheduling Problem under New Project Insertions
    Chen, HaoJie
    Zhang, Jian
    Li, Rong
    Ding, Guofu
    Qin, Shengfeng
    [J]. APPLIED SOFT COMPUTING, 2022, 124
  • [6] A hyper-heuristic based ensemble genetic programming approach for stochastic resource constrained project scheduling problem
    Chen, HaoJie
    Ding, Guofu
    Qin, Shengfeng
    Zhang, Jian
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2021, 167
  • [7] Chen T.-R., 1994, Job shop scheduling with multiple resources and an application to a semiconductor testing facility, V2, P1564
  • [8] Change Qualification Framework in Semiconductor Manufacturing
    Dass, Sasitharan Nair
    Feng, Chin Jeng
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2022, 35 (01) : 87 - 101
  • [9] Hybrid Estimation of Distribution Algorithm for the Quay Crane Scheduling Problem
    Exposito-Izquierdo, Christopher
    Luis Gonzalez-Velarde, Jose
    Melian-Batista, Belen
    Marcos Moreno-Vega, J.
    [J]. APPLIED SOFT COMPUTING, 2013, 13 (10) : 4063 - 4076
  • [10] Genetic programming-based hyper-heuristic approach for solving dynamic job shop scheduling problem with extended technical precedence constraints
    Fan, Huali
    Xiong, Hegen
    Goh, Mark
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2021, 134