共 48 条
- [1] Radiation safety issues for top-up operation at SPring-8 [J]. RADIATION MEASUREMENTS, 2006, 41 (S236-S241) : S236 - S241
- [2] Bao-Guo Z., 2004, At. Energy Sci. Technol., V38, P459
- [3] Cryogenic System for Shanghai Synchrotron Radiation Facility [J]. ADVANCES IN CRYOGENIC ENGINEERING, 2020, 755
- [7] Chen F., 2019, Nucl. Sci. Tech., V30, P3
- [9] Emery L, 2000, AIP CONF PROC, V521, P409, DOI 10.1063/1.1291823
- [10] Emery L., 2002, P 8 EUR PART ACC C E, P218