A risk-based multi-criteria maintenance planning of distribution feeders

被引:0
作者
Popovic, Zeljko N.
Krsman, Vladan D. [1 ,2 ]
Rakic, Marko P.
Airiman, Matias E. [3 ]
机构
[1] Univ Novi Sad, Fac Tech Sci, Trg Dositeja Obradov 6, Novi Sad 21000, Serbia
[2] Schneider Elect LLC, Industrijska 3G, Novi Sad 21000, Serbia
[3] Ellevio, Valhallavagen 203, S-11553 Stockholm, Sweden
关键词
Distribution network; Reliability; Maintenance planning; Uncertainty; Multi-criteria decision making; Risk assessment; DISTRIBUTION NETWORKS; RELIABILITY; INTERVAL;
D O I
10.1016/j.ijepes.2024.110379
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes a risk-based multi-criteria approach for maintenance planning of distribution feeders that uses Outage Management System (OMS) historical data to obtain a minimum-risk maintenance plan. It considers simultaneously system-oriented and local-oriented reliability indices per interruption causes to ensure the necessary granularity of the analysis and the consistency (fairness) of reliability across the system. Uncertainty in reliability indices per interruption causes is described by intervals obtained using the bootstrap method and the historical OMS data. Using the interval extension of the TOPSIS technique and the interval-valued reliability indices per interruption causes, the ranking of interruption causes by the reliability indices is performed according to a decision maker's risk preferences and preferences regarding consistency (fairness) of reliability across the system. The ranking list is further assessed using the Pareto principle to obtain a list of interruption causes, i.e., pairs (feeder, interruption cause), responsible for most power interruptions. Then, maintenance actions are defined that reduce the influence of those causes on power interruptions. For a maintenance action, intervals of cost and maintenance effectiveness factors are defined to account for the uncertainty about cost and benefit estimation. Next, using the interval extension of the TOPSIS technique, maintenance actions, i.e., pairs (feeder, maintenance action), are ranked according to a decision maker's risk preference, reliability balancing preference, and the trade-off preference between benefit and cost. The ranking list is then iteratively used within the proposed procedure to obtain an initial minimum-risk maintenance plan used as the initial solution in the proposed multi-criteria simulated annealing (MCSA) algorithm. It generates a set of Pareto-optimal maintenance plans ranked using the interval extension of TOPSIS to obtain a minimum-risk maintenance plan according to the adopted decision maker's risk preference, reliability balancing preference, and the trade-off preference between benefit and cost. The effectiveness of the proposed approach is illustrated through case studies of the real-life power distribution company that supplies about 1 million customers through around 3000 medium-voltage feeders.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] An approach to risk-based maintenance strategy of a printing press
    Kar, Avijit
    Pal, Arun Kiran
    JOURNAL OF PRINT AND MEDIA TECHNOLOGY RESEARCH, 2019, 8 (03): : 155 - 165
  • [32] Risk-based maintenance of ethylene oxide production facilities
    Khan, FI
    Haddara, MR
    JOURNAL OF HAZARDOUS MATERIALS, 2004, 108 (03) : 147 - 159
  • [33] A probabilistic multi-criteria evaluation framework for integrated energy system planning
    Zhou, Fan
    Chen, Long
    Zhao, Jun
    Wang, Wei
    INFORMATION SCIENCES, 2022, 610 : 156 - 170
  • [34] Information System Security Risk Assessment Based on IDAV Multi-Criteria Decision Model
    Yang, Jinning
    Han, Jiazhen
    Zhang, Xiuyan
    PROCEEDINGS OF 2018 12TH IEEE INTERNATIONAL CONFERENCE ON ANTI-COUNTERFEITING, SECURITY, AND IDENTIFICATION (ASID), 2018, : 121 - 127
  • [35] Dynamic Risk-Based Maintenance for Offshore Processing Facility
    Bhandari, Jyoti
    Arzaghi, Ehsan
    Abbassi, Rouzbeh
    Garaniya, Vikram
    Khan, Faisal
    PROCESS SAFETY PROGRESS, 2016, 35 (04) : 399 - 406
  • [36] Risk-based resource optimization for transmission system maintenance
    Jiang, Yong
    McCalley, James D.
    Van Voorhis, Tim
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (03) : 1191 - 1200
  • [37] Computational framework for risk-based planning of inspections, maintenance and condition monitoring using discrete Bayesian networks
    Nielsen, Jannie Sonderkaer
    Sorensen, John Dalsgaard
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2018, 14 (08) : 1082 - 1094
  • [38] Risk-based maintenance - Techniques and applications
    Arunraj, N. S.
    Maiti, J.
    JOURNAL OF HAZARDOUS MATERIALS, 2007, 142 (03) : 653 - 661
  • [39] Fuzzy Reliability and Risk-Based Maintenance of Buried Pipelines Using Multiobjective Optimization
    Ebenuwa, Andrew Utomi
    Tee, Kong Fah
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2020, 26 (02)
  • [40] An integrated multi-criteria Taguchi computer simulation-DEA approach for optimum maintenance policy and planning by incorporating learning effects
    Azadeh, A.
    Sheikhalishahi, M.
    Firoozi, M.
    Khalili, S. M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (18) : 5374 - 5385