Understanding Critical Delay Causative Factors and Their Mitigation Measures in Burundi Communal Construction Projects: A Factor Analysis and Structural Equation Modeling Approach

被引:2
作者
Irankunda, Georges [1 ]
Zhang, Wei [1 ]
Abdullahi, Usman Isah [1 ]
Fernand, Muhirwa [2 ]
David, Byiringiro [3 ]
Jean-Petit, Sinamenye [4 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Civil & Hydraul Engn, Wuhan 430074, Peoples R China
[2] Wuhan Univ, Sch Civil Engn, Hubei Key Lab Geotech & Struct Safety, Wuhan 430072, Peoples R China
[3] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Peoples R China
[4] Univ Burundi, Dept Econ & Management, UNESCO Ave 2,POB 1550, Bujumbura, Burundi
关键词
relative importance index; factor analysis; structural equation modeling; causes of delay; communal construction projects; fond national d'investissement communal (FONIC); ROAD;
D O I
10.3390/buildings15030473
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The execution of a construction project faces many potentials challenges, and delays are one of them. Communal construction projects in Burundi (CCP-Burundi projects) were considered as one field that could generate a Burundi government development plan. However, according to the frequency of delays encountered by these projects, at a rate of 70% on average every year, the government's target seems far from being achieved. As no scientific study exists on how to avoid CCP delays, this paper aims to identify and analyze factors that cause delays in CCP-Burundi and provide related measures to overcome them. Based on a list of fifty delay factors gathered from the National Communal Investment Fund institution FONIC (Fond National d'Investissement Communal), communal annual reports, and the literature, a questionnaire survey was developed and dispersed to CCP stakeholders to collect data about critical factors. The top fifteen factors were identified using a relative importance index and a factor analysis was performed. "Weather conditions" was the top-ranked factor, while "Claims" was the lowest ranked. A structural equation modeling approach was adopted to evaluate influences at the relationship level among delay factor groups. A standardized calculation revealed that Factors During Awarding of Bid (FDABs) positively influence Factors After the Award of Bid (FAABs). The findings were implemented in case studies to assess their efficacy. This paper's findings could assist upcoming construction practitioners and future researchers aiming to explore construction-related project delays, providing a fundamental understanding of the significant delays encountered in the Burundi construction industry.
引用
收藏
页数:29
相关论文
共 68 条
[1]   Data-Driven Analysis of Construction Bidding Stage-Related Causes of Disputes [J].
Ahmed, Muaz O. ;
El-adaway, Islam H. .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (05)
[2]   Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman [J].
Al Amri, Tariq ;
Marey-Perez, Manuel .
JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) :87-102
[3]   Delay Factors Management and Ranking for Reconstruction and Rehabilitation Projects Based on the Relative Importance Index (RII) [J].
Al Khatib, Basem ;
Poh, Yap Soon ;
El-Shafie, Ahmed .
SUSTAINABILITY, 2020, 12 (15)
[4]   Analyzing bidding competitiveness and success rate of contractors competing for public construction projects [J].
Alkhateeb, Ahmad M. ;
Hyari, Khaled Hesham ;
Hiyassat, Mohammed A. .
CONSTRUCTION INNOVATION-ENGLAND, 2021, 21 (04) :576-591
[5]   Dispute Classification in Construction Projects Based on Litigation Cases [J].
Alrasheed, Khaled A. ;
Soliman, Ehab ;
AlMesbah, Fajer E. .
JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (03)
[6]   Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia [J].
Alshihri, Saad ;
Al-Gahtani, Khalid ;
Almohsen, Abdulmohsen .
BUILDINGS, 2022, 12 (07)
[7]   A meta-analysis of critical causes of project delay using Spearman's rank and relative importance index integrated approach [J].
Amarkhil, Qais ;
Elwakil, Emad ;
Hubbard, Bryan .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2021, 48 (11) :1498-1507
[8]  
[Anonymous], 2018, Yahoo, DOI [10.5539/ibr.v11n2p16, DOI 10.5539/IBR.V11N2P16]
[9]   Underlying causes and mitigation measures of delays in construction projects An empirical study [J].
Arantes, Amilcar ;
Ferreira, Luis Miguel D. F. .
JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2020, 25 (02) :165-181
[10]   Effect of organizational culture on delay in construction [J].
Arditi, David ;
Nayak, Shruti ;
Damci, Atilla .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (02) :136-147