Safety Assessment of the Cover-and-Cut Method Under Blasting Vibration Induced by Tunnel Excavation

被引:0
作者
Che, Yunhao [1 ]
Chi, Enan [1 ]
机构
[1] Guizhou Univ, Sch Min Engn, Guiyang 550025, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2025年 / 15卷 / 01期
关键词
blasting vibration; cover-and-cut method; subway tunnel construction; peak particle velocity (PPV); structural safety assessment; FREQUENCY; SIGNAL; PIPELINE;
D O I
10.3390/app15010260
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
In evaluating the construction safety of the building in the subway tunnel using the cover-and-cut method, the main objective is to analyze the diaphragm wall, the central pillar, and the roof. This article conducted a blasting vibration test based on the background of the Guiyang Metro Line 3 project and used the FLAC3D software to establish a three-dimensional numerical model. The results showed that the peak particle velocity (PPV) decreased with increasing distance from the blasting center. The PPV measured at the underground diaphragm wall was 1.424 cm/s, while at the bottom of the central pillar it was 1.482 cm/s. The predicted PPV on the roof was up to 1.537 cm/s, which met the safety standards. According to the cloud map of particle vibration velocity and the comprehensive analysis of particle vibration velocity, the degree of impact of artificial structures in the subway tunnel was the central pillar, the underground diaphragm wall, and the roof in order from high to low. After eight blasting operations per day, the vibration velocity trend at the vulnerable point of the central column increases, but it will not exceed the safety standard.
引用
收藏
页数:22
相关论文
共 32 条
[1]   Analysis of predictor equations for determining the blast-induced vibration in rock blasting [J].
Cardu, Marilena ;
Coragliotto, Dario ;
Oreste, Pierpaolo .
INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2019, 29 (06) :905-915
[2]   Study on the Vibration Effects of Cyclic Blasting on Bridge Structures under Construction [J].
Che, Yunhao ;
Chi, Enan .
APPLIED SCIENCES-BASEL, 2024, 14 (13)
[3]   Main frequency band of blast vibration signal based on wavelet packet transform [J].
Chen, Guan ;
Li, Qi-Yue ;
Li, Dian-Qing ;
Wu, Zheng-Yu ;
Liu, Yong .
APPLIED MATHEMATICAL MODELLING, 2019, 74 :569-585
[4]   Present status and development trends of underground space in Chinese cities: Evaluation and analysis [J].
Chen, Zhi-Long ;
Chen, Jia-Yun ;
Liu, Hong ;
Zhang, Zhi-Feng .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 71 :253-270
[5]   Dynamic model validation using blast vibration monitoring in mine backfill [J].
Emad, Muhammad Zaka ;
Mitri, Hani ;
Kelly, Cecile .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2018, 107 :48-54
[6]   Blasting Damage Predictions by Numerical Modeling in Siahbishe Pumped Storage Powerhouse [J].
Eslami M. ;
Goshtasbi K. .
Journal of The Institution of Engineers (India): Series D, 2018, 99 (1) :133-146
[7]   Blast response of composite pipeline structure using finite element techniques [J].
Giannaros, E. ;
Kotzakolios, T. ;
Kostopoulos, V. .
JOURNAL OF COMPOSITE MATERIALS, 2016, 50 (25) :3459-3476
[8]   Reliability assessment of basal-heave stability for braced excavations in clay [J].
Goh, A. T. C. ;
Kulhawy, F. H. ;
Wong, K. S. .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2008, 134 (02) :145-153
[9]   Shape of ground surface settlement profiles caused by excavation [J].
Hsieh, PG ;
Ou, CY .
CANADIAN GEOTECHNICAL JOURNAL, 1998, 35 (06) :1004-1017
[10]   Wavelet packet analysis of blasting vibration signal of mountain tunnel [J].
Huang, Dan ;
Cui, Shuo ;
Li, Xiaoqing .
SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2019, 117 :72-80