共 50 条
- [1] An Iterated Greedy Algorithm for Distributed Flowshop Group Scheduling Problem with Total Tardiness Criterion 2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 2009 - 2014
- [2] A hybrid iterated greedy algorithm for distributed flowshop group scheduling problem to minimize total tardiness time 2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 1096 - 1101
- [3] An Iterated Greedy Algorithm for Distributed Hybrid Flowshop Scheduling Problem with Total Tardiness Minimization 2019 IEEE 15TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2019, : 350 - 355
- [5] A modified iterated greedy algorithm for distributed flowshop group scheduling problem 2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 7 - 12
- [6] An upgraded iterated greedy scheduling algorithm for distributed blocking flowshop group problem 2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 670 - 675