Risk assessment of gently inclined mudstone bedding slope incorporating monitoring information

被引:2
作者
Bai, Mingzhou [1 ]
Yang, Ling [1 ]
Liu, Lixuan [2 ]
Long, Wanxue [3 ]
Xiang, Yiming [3 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing, Peoples R China
[2] Beijing Municipal Commiss Transport, Tongzhou Highway Branch, Beijing, Peoples R China
[3] Guizhou Transportat Planning Survey & Design Inst, Guiyang, Guizhou, Peoples R China
基金
中国国家自然科学基金;
关键词
risk assessment; analytic hierarchy process; fuzzy comprehensive evaluation; operation period; monitoring information; COMPREHENSIVE EVALUATION METHOD; LANDSLIDE; SUSCEPTIBILITY; CONSTRUCTION; MODEL;
D O I
10.1080/19475705.2025.2452349
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The formation mechanism of gently inclined bedding slopes is complex and difficult to identify, the risk assessment are required. The assessment model is established by using the analytic hierarchy process (AHP) and Fuzzy Comprehensive Evaluation (FCE). Based on the analysis of instability failure modes and influencing factors for gently inclined mudstone bedding highway slopes during the operation period, topography and geomorphology, geological conditions, natural inducements and slope deformation are selected as the evaluation indices, and the corresponding criteria of risk assessment system are established. The weights of evaluation indices are obtained by using AHP, and the measure functions are established to assess single index measurement and synthetic measurement. The weighted average membership degree criterion is adopted to discern the risk grade. The results indicate that the secondary indicators affecting the stability of gently inclined mudstone bedding slopes are modified tangent angle (0.137) and internal friction angle (0.126). This indicates it is necessary to incorporate deformation monitoring information into evaluation indicators, and the risk grade was determined as high risk, which corresponds with actual monitoring data and verifies the reliability of the present method. It provides a novel approach for risk assessment of gently inclined mudstone bedding slopes during the operation period.
引用
收藏
页数:23
相关论文
共 37 条
[1]  
Chen L., 2016, Min Res Develop, V36, P99, DOI [10.13827/j.cnki.kyyk.2016.04.024, DOI 10.13827/J.CNKI.KYYK.2016.04.024]
[2]   A New Evaluation Method for Slope Stability Based on TOPSIS and MCS [J].
Chen, Wenqiang ;
Zhao, Yufei ;
Liu, Lipeng ;
Wang, Xiaogang .
ADVANCES IN CIVIL ENGINEERING, 2020, 2020
[3]  
Chen Xiaoli, 2022, Zhonghua Yi Xue Yi Chuan Xue Za Zhi, V39, P1, DOI 10.3760/cma.j.cn511374-20200220-00143
[4]  
Chen Z., 2016, Chin. J. Rock Mech. Eng, V35, P3785
[5]   A comparative study for landslide susceptibility assessment using machine learning algorithms based on grid unit and slope unit [J].
Deng, Niandong ;
Li, Yuxin ;
Ma, Jianquan ;
Shahabi, Himan ;
Hashim, Mazlan ;
de Oliveira, Gabriel ;
Chaeikar, Saman Shojae .
FRONTIERS IN ENVIRONMENTAL SCIENCE, 2022, 10
[6]  
[杜岩 Du Yan], 2022, [工程力学, Engineering Mechanics], V39, P249
[7]   Risk evaluation of colluvial cutting slope based on fuzzy analytic hierarchy process and multilevel fuzzy comprehensive evaluation [J].
Du, Yuxiang ;
Sheng, Qian ;
Fu, Xiaodong ;
Tang, Hua ;
Zhang, Zhenping ;
Zhao, Xin .
JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2019, 37 (03) :4253-4271
[8]   Risk assessment of landfill instability based on set pair-combination weighting [J].
Feng Shi-jin ;
Xu Yi ;
Yang Jun-yi ;
Zheng Qi-teng ;
Zhang Xiao-lei .
ROCK AND SOIL MECHANICS, 2024, 45 (07) :2129-2139
[9]  
Feng Zhong-ju, 2020, Journal of Traffic and Transportation Engineering, V20, P55, DOI 10.19818/j.cnki.1671-1637.2020.02.005
[10]   Research on index system of rock slope safety evaluation for open pit mine [J].
Gao Yu-kun ;
Bao Na ;
Zhang Ying-hua ;
Jiang Li-ming ;
Huang Zhi-an .
ISMSSE 2011, 2011, 26