Bi-objective dynamic tugboat scheduling with speed optimization under stochastic and time-varying service demands

被引:1
|
作者
Wei, Xiaoyang [1 ]
Lau, Hoong Chuin [2 ]
Xiao, Zhe [1 ]
Fu, Xiuju [1 ]
Zhang, Xiaocai [1 ]
Qin, Zheng [1 ]
机构
[1] ASTAR, Inst High Performance Comp, 1 Fusionopolis Way,Connexis North Tower, Singapore 138632, Singapore
[2] Singapore Management Univ, Sch Comp & Informat Syst, 80 Stamford Rd, Singapore 178902, Singapore
关键词
Dynamic and stochastic programming; Multi-objective optimization; Speed optimization; Markov decision process; Proactive waiting decision; Tugboat scheduling;
D O I
10.1016/j.tre.2024.103876
中图分类号
F [经济];
学科分类号
02 ;
摘要
With the growing emphasis on green shipping to reduce the environmental impact of maritime transportation, optimizing fuel consumption with maintaining high service quality has become critical in port operations. Ports are essential nodes in global supply chains, where tugboats play a pivotal role in the safe and efficient maneuvering of ships within constrained environments. However, existing literature lacks approaches that address tugboat scheduling under realistic operational conditions. To fill the research gap, this is the first work to propose the bi-objective dynamic tugboat scheduling problem that optimizes speed under stochastic and time-varying demands, aiming to minimize fuel consumption and manage service punctuality across a heterogeneous fleet. For the first time, we develop an extended Markov decision process framework that integrates both reactive task assignments and proactive waiting decisions, considering the dual objectives. Subsequently, an initial schedule for known requests is established using a mixed- integer linear programming model, and an anticipatory approximate dynamic programming method dynamically incorporates emerging demands through task assignments and waiting plans. This approach is further enhanced by an improved rollout algorithm to anticipate future scenarios and make decisions efficiently. Applied to the Singapore port, our methodology achieves a 12.8% reduction in the total sail cost compared to the tugboat company's scheduling practices, resulting in significant daily savings. The results with benchmarking against three methods demonstrate improvements in cost efficiency and service punctuality, meanwhile, extensive sensitivity analysis provides managerial insights for operational practice.
引用
收藏
页数:25
相关论文
共 50 条
  • [41] HEURISTIC SCHEDULING POLICY FOR MULTI-ITEM, SINGLE-MACHINE PRODUCTION SYSTEMS WITH TIME-VARYING, STOCHASTIC DEMANDS.
    Leachman, Robert C.
    Gascon, Andre
    Management Science, 1988, 34 (03): : 377 - 390
  • [42] Distributed Online Optimization With Dynamic Coupling Constraints Under Time-Varying Communication Delays
    Inoue, Keito
    Hayashi, Naoki
    Takai, Shigemasa
    IEEE ACCESS, 2023, 11 : 87256 - 87269
  • [43] Dynamic Optimization of a Subcritical Steam Power Plant Under Time-Varying Power Load
    Chen, Chen
    Bollas, George M.
    PROCESSES, 2018, 6 (08):
  • [44] Dynamic multi-objective optimization based on membrane computing for control of time-varying unstable plants
    Huang, Liang
    Suh, Il Hong
    Abraham, Ajith
    INFORMATION SCIENCES, 2011, 181 (11) : 2370 - 2391
  • [45] Parametric control to linear time-varying systems based on dynamic compensator and multi-objective optimization
    Gu, Da-Ke
    Zhang, Da-Wei
    Duan, Guang-Ren
    ASIAN JOURNAL OF CONTROL, 2020, 22 (06) : 2395 - 2411
  • [46] Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: Application to the permutation flow shop problem
    Boufellouh, Radhwane
    Belkaid, Faycal
    COMPUTERS & OPERATIONS RESEARCH, 2020, 122
  • [47] Stochastic Dynamic Programming of Air Conditioning System under Time-varying Passenger Condition for Electric Bus
    Yan, Mei
    He, Hongwen
    Sun, Chao
    Jia, Hui
    Li, Menglin
    CLEAN ENERGY FOR CLEAN CITY: CUE 2016 - APPLIED ENERGY SYMPOSIUM AND FORUM: LOW-CARBON CITIES AND URBAN ENERGY SYSTEMS, 2016, 104 : 360 - 365
  • [48] Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    Moradi, E.
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (06) : 7169 - 7178
  • [49] Positive role of bifurcation on stochastic resonance and its application in fault diagnosis under time-varying rotational speed
    Wang, Zhile
    Yang, Jianhua
    Guo, Yu
    Gong, Tao
    Shan, Zhen
    JOURNAL OF SOUND AND VIBRATION, 2022, 537
  • [50] Day-Ahead scheduling of centralized energy storage system in electrical networks by proposed stochastic MILP-Based bi-objective optimization approach
    Eslahi, M.
    Nematollahi, A. Foroughi
    Vahidi, B.
    ELECTRIC POWER SYSTEMS RESEARCH, 2021, 192