Optimizing claim management process groups to enhance construction project success

被引:0
|
作者
Abdelalim, Ahmed Mohammed [1 ]
Salem, Mohamed [2 ]
Al-Sabah, Ruqaya [3 ]
Said, Salah Omar [4 ]
Elshafei, Hisham Mahmoud [5 ]
Badawy, Mohamed Galal [6 ]
机构
[1] Helwan Univ, Fac Engn, Mataria, Cairo, Egypt
[2] Australian Univ Kuwait, Dept Civil Engn, Coll Engn, Kuwait, Kuwait
[3] KUWAIT UNIV, Coll Engn & Petr, Kuwait, Kuwait
[4] Helwan Univ, Fac Engn Mataria, Cairo, Egypt
[5] KASCH, Riyadh, Saudi Arabia
[6] Helwan Univ, Fac Engn Mataria, Mataria, Cairo, Egypt
关键词
Contractual disputes; construction industry; claims; claim management processes groups; MODEL;
D O I
10.1080/15623599.2025.2453931
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the complex construction projects, claims arising from unforeseen circumstances, contractual disputes, or project changes can significantly impact project outcomes, making effective claim management a critical aspect of overall project success. Ineffective claim management can lead to project delays, cost overruns, and in severe cases, project termination. This study examines critical factors influencing claim management in construction projects, analyzing stakeholder perceptions through a questionnaire distributed to 104 industry professionals. Using convenience sampling, the study utilizes a Relative Importance Index (RII), Frequency Index (FI), and Frequency Adjusted Importance Index (FAII) to rank the significance of 108 identified claim management factors across eight process groups. The findings emphasize the criticality of clear communication and robust contract management in mitigating claims. Poor negotiation skills, adversarial relationships, and inadequate documentation are identified as major obstacles to effective claim resolution. Pearson correlation analysis reveals strong correlations between key factors and their respective process groups, reinforcing the reliability. The research highlights the 'claims resolution' phase as particularly crucial, with factors like the use of balanced contracts (e.g. FIDIC/ICE) and comprehensive claim documentation emerging as highly significant. The study provides valuable insights for industry practitioners to enhance claim management practices and ultimately, improve project success rates.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] Project success and project team management: Evidence from capital projects in the process industries
    Scott-Young, Christina
    Samson, Danny
    JOURNAL OF OPERATIONS MANAGEMENT, 2008, 26 (06) : 749 - 766
  • [42] PROJECT COST-BENEFIT ANALYSIS: AN IMPROVEMENT TO CONSTRUCTION PROJECT MANAGEMENT PROCESS
    Pulmanis, Emils
    Bruna, Silvija
    NEW CHALLENGES OF ECONOMIC AND BUSINESS DEVELOPMENT - 2012, 2012, : 516 - 526
  • [43] PREDICTING PROJECT SUCCESS IN CONSTRUCTION USING AN EVOLUTIONARY GAUSSIAN PROCESS INFERENCE MODEL
    Cheng, Min-Yuan
    Huang, Chin-Chi
    Van Roy, Andreas Franskie
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2013, 19 : S202 - S211
  • [44] Optimizing Earned Value Method in Construction Project Management Based on Critical Path
    Zhang Hong
    Proceedings of 2008 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2008, : 171 - 173
  • [45] Research on International Project Contract Management and Claim
    Li, Xiaoliang
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON EDUCATION, SPORTS, ARTS AND MANAGEMENT ENGINEERING (ICESAME 2017), 2017, 123 : 814 - 817
  • [47] Preliminary Study of the Systematic Management of Project Claim
    Liu Yun
    Xu Wei
    Tang Jiong
    Liu Xin
    Jin Ruijun
    PROCEEDINGS OF THE 2009 WRI GLOBAL CONGRESS ON INTELLIGENT SYSTEMS, VOL II, 2009, : 572 - 576
  • [48] Dynamic adaptation of user interfaces to enhance information management of a building construction project
    Lasserre, S
    Ameziane, F
    Computer Graphics, Imaging and Vision: New Trends, 2005, : 391 - 396
  • [49] The Project Management Process of Planning and Budgeting in Public Construction Projects
    Larsen, Jesper Kranker
    Ussing, Lene Faber
    Brunoe, Thomas Ditlev
    Lindhard, Soren Munch
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2015, 6 (04) : 20 - 33
  • [50] PROJECT PARTNERING + NEW MANAGEMENT STRATEGY STREAMLINES THE CONSTRUCTION PROCESS
    DORRIS, VK
    ARCHITECTURE-THE AIA JOURNAL, 1993, 82 (10): : 111 - 113