Optimizing claim management process groups to enhance construction project success

被引:0
|
作者
Abdelalim, Ahmed Mohammed [1 ]
Salem, Mohamed [2 ]
Al-Sabah, Ruqaya [3 ]
Said, Salah Omar [4 ]
Elshafei, Hisham Mahmoud [5 ]
Badawy, Mohamed Galal [6 ]
机构
[1] Helwan Univ, Fac Engn, Mataria, Cairo, Egypt
[2] Australian Univ Kuwait, Dept Civil Engn, Coll Engn, Kuwait, Kuwait
[3] KUWAIT UNIV, Coll Engn & Petr, Kuwait, Kuwait
[4] Helwan Univ, Fac Engn Mataria, Cairo, Egypt
[5] KASCH, Riyadh, Saudi Arabia
[6] Helwan Univ, Fac Engn Mataria, Mataria, Cairo, Egypt
关键词
Contractual disputes; construction industry; claims; claim management processes groups; MODEL;
D O I
10.1080/15623599.2025.2453931
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the complex construction projects, claims arising from unforeseen circumstances, contractual disputes, or project changes can significantly impact project outcomes, making effective claim management a critical aspect of overall project success. Ineffective claim management can lead to project delays, cost overruns, and in severe cases, project termination. This study examines critical factors influencing claim management in construction projects, analyzing stakeholder perceptions through a questionnaire distributed to 104 industry professionals. Using convenience sampling, the study utilizes a Relative Importance Index (RII), Frequency Index (FI), and Frequency Adjusted Importance Index (FAII) to rank the significance of 108 identified claim management factors across eight process groups. The findings emphasize the criticality of clear communication and robust contract management in mitigating claims. Poor negotiation skills, adversarial relationships, and inadequate documentation are identified as major obstacles to effective claim resolution. Pearson correlation analysis reveals strong correlations between key factors and their respective process groups, reinforcing the reliability. The research highlights the 'claims resolution' phase as particularly crucial, with factors like the use of balanced contracts (e.g. FIDIC/ICE) and comprehensive claim documentation emerging as highly significant. The study provides valuable insights for industry practitioners to enhance claim management practices and ultimately, improve project success rates.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Project Management in Practice: Implementing a Process to Ensure Accountability and Success
    Feeney, Mary
    Sult, Leslie
    JOURNAL OF LIBRARY ADMINISTRATION, 2011, 51 (7-8) : 744 - 763
  • [32] Integrating risk management and psychological health for enhanced construction project success
    Li, Yifan
    Cui, Peng
    Wang, Yufei
    INTERNATIONAL JOURNAL OF MENTAL HEALTH NURSING, 2024, 33 : 41 - 42
  • [33] Critical project management success factors analysis for the construction industry of Bangladesh
    Datta, Shuvo Dip
    Sobuz, Md. Habibur Rahman
    Nafe Assafi, Mohammad
    Sutan, Norsuzailina Mohamed
    Islam, Md. Nazrul
    Mannan, Maria Binte
    Akid, Abu Sayed Mohammad
    Hasan, Noor Md. Sadiqul
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2023,
  • [34] Hierarchical structuring success factors of project stakeholder management in the construction organization
    Li, Yongkui
    Lu, Yujie
    Peng, Yi
    AFRICAN JOURNAL OF BUSINESS MANAGEMENT, 2011, 5 (22): : 9705 - 9713
  • [35] Utilizing blockchain to enhance project management information systems: insights into project portfolio success, knowledge management and learning capabilities
    Alkhudary, Rami
    Gardiner, Paul
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2024, 17 (4/5) : 731 - 754
  • [36] Improving construction claim management in Malaysian construction industry
    Bakhary, Nor Azmi
    Adnan, Hamimah
    Ibrahim, Azmi
    6TH INTERNATIONAL CONFERENCE OF EURO ASIA CIVIL ENGINEERING FORUM (EACEF 2017), 2017, 138
  • [37] Soft skills of construction project management professionals and project success factors: A structural equation model
    Zuo, Jian
    Zhao, Xianbo
    Quan Bui Minh Nguyen
    Ma, Tony
    Gao, Shang
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (03) : 425 - 442
  • [38] Project Management Knowledge of Construction Professionals: Cross-Country Study of Effects on Project Success
    Chou, Jui-Sheng
    Irawan, Nelly
    Anh-Duc Pham
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (11)
  • [39] Improving Sustainable Project Success Strategies Focused on Cost and Schedule for Electrical Construction Project Management
    Kim, Janghwan
    Lim, Jeeyoung
    Lim, Hyoung-Chul
    Kim, Dae Young
    SUSTAINABILITY, 2022, 14 (05)
  • [40] Claim management office maturity model (CMOMM) in project-oriented organizations in the construction industry
    Parchamijalal, Majid
    Moradi, Saeed
    Shirazi, Mohsen Zabihi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (01) : 74 - 104