Optimizing claim management process groups to enhance construction project success

被引:0
|
作者
Abdelalim, Ahmed Mohammed [1 ]
Salem, Mohamed [2 ]
Al-Sabah, Ruqaya [3 ]
Said, Salah Omar [4 ]
Elshafei, Hisham Mahmoud [5 ]
Badawy, Mohamed Galal [6 ]
机构
[1] Helwan Univ, Fac Engn, Mataria, Cairo, Egypt
[2] Australian Univ Kuwait, Dept Civil Engn, Coll Engn, Kuwait, Kuwait
[3] KUWAIT UNIV, Coll Engn & Petr, Kuwait, Kuwait
[4] Helwan Univ, Fac Engn Mataria, Cairo, Egypt
[5] KASCH, Riyadh, Saudi Arabia
[6] Helwan Univ, Fac Engn Mataria, Mataria, Cairo, Egypt
关键词
Contractual disputes; construction industry; claims; claim management processes groups; MODEL;
D O I
10.1080/15623599.2025.2453931
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the complex construction projects, claims arising from unforeseen circumstances, contractual disputes, or project changes can significantly impact project outcomes, making effective claim management a critical aspect of overall project success. Ineffective claim management can lead to project delays, cost overruns, and in severe cases, project termination. This study examines critical factors influencing claim management in construction projects, analyzing stakeholder perceptions through a questionnaire distributed to 104 industry professionals. Using convenience sampling, the study utilizes a Relative Importance Index (RII), Frequency Index (FI), and Frequency Adjusted Importance Index (FAII) to rank the significance of 108 identified claim management factors across eight process groups. The findings emphasize the criticality of clear communication and robust contract management in mitigating claims. Poor negotiation skills, adversarial relationships, and inadequate documentation are identified as major obstacles to effective claim resolution. Pearson correlation analysis reveals strong correlations between key factors and their respective process groups, reinforcing the reliability. The research highlights the 'claims resolution' phase as particularly crucial, with factors like the use of balanced contracts (e.g. FIDIC/ICE) and comprehensive claim documentation emerging as highly significant. The study provides valuable insights for industry practitioners to enhance claim management practices and ultimately, improve project success rates.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Performance Indicators for the Claim Management Process of Construction Projects
    Seo, Wonkyoung
    Kang, Youngcheol
    COMPUTING IN CIVIL ENGINEERING 2019: VISUALIZATION, INFORMATION MODELING, AND SIMULATION, 2019, : 611 - 617
  • [2] The Management of Working-Day Claim for Project Construction in FIDIC Construction Contract Condition
    Jun, Liu
    Kun, Liu
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2010, : 1635 - +
  • [3] Project management in Construction process disturbances
    不详
    BAUINGENIEUR, 2011, 86 : A12 - A12
  • [4] Risk management process in construction project
    Liu Renhui
    Tai Shuangliang
    Zhao Qingjie
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 843 - 846
  • [5] Ranking the Project Management Success Factors for Construction Project in South India
    Aneesha, K.
    Haridharan, M. K.
    INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND INFRASTRUCTURAL ISSUES IN EMERGING ECONOMIES (ICCIEE 2017), 2017, 80
  • [6] EFFECT OF RELATIONSHIP MANAGEMENT ON CONSTRUCTION PROJECT SUCCESS DELIVERY
    Daboun, Omar
    Abidin, Nur IzieAdiana
    Khoso, Ali Raza
    Chen, Zhen-Song
    Yusof, Aminah Md
    Skibniewski, Miroslaw J.
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2023, 29 (05) : 372 - 397
  • [7] Critical Success Factors for Sustainable Construction Project Management
    Gunduz, Murat
    Almuajebh, Mohammed
    SUSTAINABILITY, 2020, 12 (05)
  • [8] Critical Success Factors for Construction Project Management in Nigeria
    Musa, Mohammed Mukhtar
    Bin Amirudin, Roslan
    Dalhatu, Abdussalam
    Musa, Mohammed Aminu
    ADVANCED SCIENCE LETTERS, 2018, 24 (05) : 3809 - 3813
  • [9] Success model of project management information system in construction
    Lee, Seul-Ki
    Yu, Jung-Ho
    AUTOMATION IN CONSTRUCTION, 2012, 25 : 82 - 93