Q-Learning-Assisted Meta-Heuristics for Scheduling Distributed Hybrid Flow Shop Problems

被引:1
|
作者
Zhu, Qianyao [1 ]
Gao, Kaizhou [1 ]
Huang, Wuze [1 ]
Ma, Zhenfang [1 ]
Slowik, Adam [2 ]
机构
[1] Macau Univ Sci & Technol, Inst Syst Engn, Macau 99078, Peoples R China
[2] Koszalin Univ Technol, Dept Elect & Comp Sci, PL-75453 Koszalin, Poland
来源
CMC-COMPUTERS MATERIALS & CONTINUA | 2024年 / 80卷 / 03期
基金
中国国家自然科学基金;
关键词
Distributed scheduling; hybrid flow shop; meta-heuristics; local search; Q-learning; MINIMIZING MAKESPAN;
D O I
10.32604/cmc.2024.055244
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The flow shop scheduling problem is important for the manufacturing industry. Effective flow shop scheduling can bring great benefits to the industry. However, there are few types of research on Distributed Hybrid Flow Shop Problems (DHFSP) by learning assisted meta-heuristics. This work addresses a DHFSP with minimizing the maximum completion time (Makespan). First, a mathematical model is developed for the concerned DHFSP. Second, four Q-learning-assisted meta-heuristics, e.g., genetic algorithm (GA), artificial bee colony algorithm (ABC), particle swarm optimization (PSO), and differential evolution (DE), are proposed. According to the nature of DHFSP, six local search operations are designed for finding high-quality solutions in local space. Instead of random selection, Q-learning assists meta-heuristics in choosing the appropriate local search operations during iterations. Finally, based on 60 cases, comprehensive numerical experiments are conducted to assess the effectiveness of the proposed algorithms. The experimental results and discussions prove that using Q-learning to select appropriate local search operations is more effective than the random strategy. To verify the competitiveness of the Q-learning assistedmeta-heuristics, they are compared with the improved iterated greedy algorithm (IIG), which is also for solving DHFSP. The Friedman test is executed on the results by five algorithms. It is concluded that the performance of four Q-learning-assisted meta-heuristics are better than IIG, and the Q-learning-assisted PSO shows the best competitiveness.
引用
收藏
页码:3573 / 3589
页数:17
相关论文
共 50 条
  • [11] Solving Heterogeneous USV Scheduling Problems by Problem-Specific Knowledge Based Meta-Heuristics with Q-Learning
    Ma, Zhenfang
    Gao, Kaizhou
    Yu, Hui
    Wu, Naiqi
    MATHEMATICS, 2024, 12 (02)
  • [12] Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics
    Zikai Zhang
    Qiuhua Tang
    Flexible Services and Manufacturing Journal, 2022, 34 : 156 - 203
  • [13] Effective constructive heuristics and meta-heuristics for the distributed assembly permutation flowshop scheduling problem
    Pan, Quan-Ke
    Gao, Liang
    Li Xin-Yu
    Jose, Framinan M.
    APPLIED SOFT COMPUTING, 2019, 81
  • [14] Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics
    Zhang, Zikai
    Tang, Qiuhua
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2022, 34 (01) : 156 - 203
  • [15] Ensemble meta-heuristics and Q-learning for staff dissatisfaction constrained surgery scheduling and rescheduling
    Yu, Hui
    Gao, Kai-zhou
    Wu, Naiqi
    Suganthan, Ponnuthurai Nagaratnam
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 134
  • [16] Two efficient nature inspired meta-heuristics solving blocking hybrid flow shop manufacturing problem
    Aqil, Said
    Allali, Karam
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2021, 100
  • [17] Energy-efficient multi-objective distributed assembly permutation flowshop scheduling by Q-learning based meta-heuristics
    Yu, Hui
    Gao, Kaizhou
    Li, Zhiwu
    Suganthan, Ponnuthurai Nagaratnam
    APPLIED SOFT COMPUTING, 2024, 166
  • [18] Heuristics based hybrid approach of flow shop scheduling problem
    Lokesh, K.
    Jayaprakash, J.
    Alene, Tibebu
    4TH INTERNATIONAL CONFERENCE ON DESIGN, ANALYSIS, MANUFACTURING AND SIMULATION (ICDAMS 2020), 2020, 992
  • [19] Three meta-heuristics to solve the no-wait two-stage assembly flow-shop scheduling problem
    Mozdgir, A.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Navaei, J.
    SCIENTIA IRANICA, 2013, 20 (06) : 2275 - 2283
  • [20] Two new meta-heuristics for a bi-objective supply chain scheduling problem in flow-shop environment
    Hassanzadeh, Alborz
    Rasti-Barzoki, Morteza
    Khosroshahi, Hossein
    APPLIED SOFT COMPUTING, 2016, 49 : 335 - 351