Role of the BOR-60 research reactor in the development of fast reactors

被引:0
作者
Tuzov, A. A. [1 ]
Izhutov, A. L. [1 ]
Krasheninnikov, Yu. M. [1 ]
Zhemkov, I. Yu. [1 ]
Kryukov, F. N. [1 ]
机构
[1] JSC SSC RIAR, Dimitrovgrad, Russia
关键词
621.039.51;
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Being put into operation in December 1969, the BOR-60 reactor has been operating successfully for more than 54 years at design parameters without replacements of the main process equipment and sodium of the primary and secondary cooling circuits. Its operating experience was used in the development of BN-350 and -600 reactors. The experience of the BOR-60 operation and experimental studies was used to develop a concept of a MBIR multi-purpose research fast reactor currently being built at the site of the JSC "SSC RIAR". The article presents the main results of the BOR-60 operation and experimental studies.
引用
收藏
页码:233 / 244
页数:12
相关论文
共 4 条
[1]   PROLONGATION OF THE BOR-60 REACTOR OPERATION [J].
Izhutou, Alexey L. ;
Krasheninnikov, Yuri M. ;
Zhemkov, Igor Y. ;
Varivtsev, Artem V. ;
Naboishchikov, Yuri V. ;
Neustroev, Victor S. ;
Shamardin, Valentin K. .
NUCLEAR ENGINEERING AND TECHNOLOGY, 2015, 47 (03) :253-259
[2]  
Korolkov AS., 2001, Atomnaya Energiya, V91, P363
[3]  
Krasheninnikov YM., 2023, Bezopasnost IYaU, P36
[4]  
Yu Zhemkov I., 2020, Nauchno-Tekhnich. Konf. Zamykanie Toplivnogo Tsikla Yadernoi Energetiki na Baze Reaktorov na Bystrykh Neitronakh, P137