Comparative study of seismic performance between fixed base and base-isolated regular RC frames (G+21 floors) using SAP 2000

被引:0
作者
Kartik Khare [1 ]
Ankit Soni [1 ]
Chayan Gupta [1 ]
Ashwin Parihar [1 ]
机构
[1] Medicaps University, Indore
关键词
Base isolation; Fixed base structure; High-rise RC frames; SAP; 2000; modeling; Seismic performance;
D O I
10.1007/s42107-024-01136-3
中图分类号
学科分类号
摘要
The study investigates the seismic performance of fixed base and base-isolated regular reinforced concrete (RC) frames (G+21 floors) using SAP 2000. High-rise buildings in seismic zones require innovative design approaches to mitigate earthquake-induced damages. Base isolation is a promising technique that decouples the structure from ground motions, potentially reducing seismic forces and enhancing performance. This research focuses on comparative analysis through detailed modeling and simulations. Two structural models—fixed base and base-isolated—are developed in SAP 2000. The base-isolated model incorporates elastomeric bearings to absorb seismic energy. The study evaluates seismic response parameters, including story displacements, base shear forces, inter-story drift ratios, and natural frequencies. Results indicate significant improvements in the seismic performance of the base-isolated structure compared to the fixed base. Maximum lateral displacements and inter-story drift ratios are considerably lower in the base-isolated model, demonstrating enhanced stability and reduced damage potential. Base shear forces are also substantially reduced, highlighting the effectiveness of base isolation in dissipating seismic energy. The natural frequency analysis shows a shift to lower values for the base-isolated structure, confirming the increased flexibility and energy absorption capacity. The findings underscore the potential of base isolation to improve seismic resilience in high-rise buildings, providing valuable insights for engineers and designers in seismic-prone regions. Future research should explore various isolation materials and configurations to optimize performance further. © The Author(s), under exclusive licence to Springer Nature Switzerland AG 2024.
引用
收藏
页码:5657 / 5667
页数:10
相关论文
共 35 条
[21]  
Naderpour H., Naji N., Burkacki D., Jankowski R., Seismic response of high-rise buildings equipped with base isolation and non-traditional tuned mass dampers, Applied Sciences (Switzerland), 9, 6, pp. 6-9, (2019)
[22]  
Ozer E., Seismic pounding of adjacent buildings considering torsional effects, In Bulletin of Earthquake Engineering (, 22, 4, (2024)
[23]  
Patel Y.Y., Pandey P., Comparision of fixed base and base isolation reinforced concrete structure for seismic response, International Journal of Advance Engineering and Research Development, 4, 4, (2017)
[24]  
Patil A.K., Solanke A.P., Dabhekar K.R., Khedikar I.P., Agrawal R., Rajput P.P., Chavan P.V., Comparative analysis of structure with and without seismic load, IOP Conference Series: Materials Science and Engineering, 1197, 1, (2021)
[25]  
Patil A.S., Agarwal A.K., Sharma K., Trivedi M.K., Time-cost trade-off optimization model for retrofitting planning projects using MOGA, Asian Journal of Civil Engineering, (2024)
[26]  
Scheller J., Constantinou M.C., Hall K., Response history analysis of structures with seismic isolation and energy dissipation systems: Verification examples for program SAP2000 by, In Mceer (Vols, pp. 14260-14300, (1999)
[27]  
Sethi K.C., Prajapati U., Parihar A., Gupta C., Shrivastava G., Sharma K., Development of optimization model for balancing time, cost, and environmental impact in retrofitting projects with NSGA-III, Asian Journal of Civil Engineering, (2024)
[28]  
Sethi K.C., Rathinakumar V., Harishankar S., Bhadoriya G., Pati A.K., Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects, Asian Journal of Civil Engineering, (2024)
[29]  
Sharma K., Trivedi M.K., Development of multi-objective scheduling model for construction projects using opposition-based NSGA III, Journal of the Institution of Engineers (India): Series A, (2021)
[30]  
Sharma K., Trivedi M.K., AHP and Nsga-Ii-Based time–cost–quality Trade-Off Optimization Model for Construction Projects, pp. 45-63, (2022)