共 35 条
[21]
Naderpour H., Naji N., Burkacki D., Jankowski R., Seismic response of high-rise buildings equipped with base isolation and non-traditional tuned mass dampers, Applied Sciences (Switzerland), 9, 6, pp. 6-9, (2019)
[22]
Ozer E., Seismic pounding of adjacent buildings considering torsional effects, In Bulletin of Earthquake Engineering (, 22, 4, (2024)
[23]
Patel Y.Y., Pandey P., Comparision of fixed base and base isolation reinforced concrete structure for seismic response, International Journal of Advance Engineering and Research Development, 4, 4, (2017)
[24]
Patil A.K., Solanke A.P., Dabhekar K.R., Khedikar I.P., Agrawal R., Rajput P.P., Chavan P.V., Comparative analysis of structure with and without seismic load, IOP Conference Series: Materials Science and Engineering, 1197, 1, (2021)
[25]
Patil A.S., Agarwal A.K., Sharma K., Trivedi M.K., Time-cost trade-off optimization model for retrofitting planning projects using MOGA, Asian Journal of Civil Engineering, (2024)
[26]
Scheller J., Constantinou M.C., Hall K., Response history analysis of structures with seismic isolation and energy dissipation systems: Verification examples for program SAP2000 by, In Mceer (Vols, pp. 14260-14300, (1999)
[27]
Sethi K.C., Prajapati U., Parihar A., Gupta C., Shrivastava G., Sharma K., Development of optimization model for balancing time, cost, and environmental impact in retrofitting projects with NSGA-III, Asian Journal of Civil Engineering, (2024)
[28]
Sethi K.C., Rathinakumar V., Harishankar S., Bhadoriya G., Pati A.K., Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects, Asian Journal of Civil Engineering, (2024)
[29]
Sharma K., Trivedi M.K., Development of multi-objective scheduling model for construction projects using opposition-based NSGA III, Journal of the Institution of Engineers (India): Series A, (2021)
[30]
Sharma K., Trivedi M.K., AHP and Nsga-Ii-Based time–cost–quality Trade-Off Optimization Model for Construction Projects, pp. 45-63, (2022)