Transformation of Anti-Jamming Capability of Chinese Remanufactured Tunnel Boring Machines in Soft Rock Tunnels

被引:0
作者
Zhang, Xiaoping [1 ]
Liu, Yongbin [1 ]
Zhang, Chunyu [2 ]
Li, Xinfang [1 ]
Wang, Hongwu [2 ]
Liu, Quansheng [1 ]
机构
[1] Key Laboratory of Safety for Geotechnical and Structural Engineering of Hubei Province, School of Civil Engineering, Wuhan University, Hubei, Wuhan
[2] China Railway 18th Bureau Group Tunnel Engineering Co., Ltd., Chongqing
关键词
anti-jamming; highway tunnel; open tunnel boring machine; remanufacturing; soft rock; structural transformation;
D O I
10.3973/j.issn.2096-4498.2025.02.016
中图分类号
学科分类号
摘要
A case study on the pilot tunnel of the Daliangshan No. 1 tunnel is conducted with the aim of enhancing the anti-jamming and jam-releasing capabilities of remanufactured open tunnel boring machines (TBMs) in soft rock tunnels. The necessity of anti-jamming transformations for remanufactured TBMs is analyzed by employing suitable engineering practices, and transformation strategies targeting the main drive, support system, and cutterhead over-excavation system are proposed. The engineering practices demonstrate the following. (1) Replacing the main drive gearbox reducer increases the remanufactured TBM′s rated and recovery torque by 38%. (2) Modifications to the shield and pipe-roof drilling machine facilitate the rapid installation of advance pipe roofs using shield guide holes. In addition, an integrated gear ring facilitates the quick mobility and precise positioning of the pipe-roof drilling machine and emergency shotcrete equipment. These measures result in the establishment of a continuous and enclosed support system that integrates the shield, rock bolts, steel ribs, emergency shotcrete, and steel arches. (3) An over-excavation scheme incorporating cutter edge extension and pre-reserved over-excavation cutter boxes is proposed. Combined with main drive elevation technology, this approach facilitates long-distance continuous over-excavation in soft rock tunnel sections. Finally, field applications confirm the feasibility and effectiveness of the proposed anti-jamming transformation strategies. © 2025 Editorial Office of Tunnel Construction. All rights reserved.
引用
收藏
页码:402 / 414
页数:12
相关论文
共 33 条
[1]  
CHEN Xiangsheng, XU Zhihao, BAO Xiaohua, Et al., Challenges and technological breakthroughs in tunnel construction in China, China Journal of Highway and Transport, 33, 12, (2020)
[2]  
HONG Kairong, Development and prospects of tunnels and underground works in China in recent two years, Tunnel Construction, 37, 2, (2017)
[3]  
XIE W Q, ZHANG X P, LIU X L, Et al., Real-time perception of rock-machine interaction information in TBM tunneling using muck image analysis, Tunnelling and Underground Space Technology, 136, (2023)
[4]  
QI Mengxue, An exploration into the application of remanufacturing TBMs in China, Traffic Engineering and Technology for National Defence, 9, 4, (2011)
[5]  
SUN Haibo, Open TBM remanufacturing key technology and practice, Construction Mechanization, 38, 12, (2017)
[6]  
Full face tunnel boring machine remanufacturing: GB/T 37432-2019, (2019)
[7]  
VARDAKOS S, HANI M S, JARAMILLA F, Et al., Tunneling in rock for Chicago′ s Albany Park Stormwater diversion tunnel, Proceedings of the ARMA US Rock Mechanics/ Geomechanics Symposium, (2019)
[8]  
LIU Z J, TENG H F, HU Q H., Adaptable redesign of existing equipment responding to unanticipated environment changes, Applied Mechanics and Materials, 37, 38, (2010)
[9]  
YANG Qinghui, ZHOU Yanling, QI Mengxue, Et al., On the application of re-making TBM and our exploration into the quality control measures for it, Traffic Engineering and Technology for National Defence, 13, 2, (2015)
[10]  
LIU Quansheng, HUANG Xing, PAN Yucong, Et al., Application and research progress of TBM tunneling in coal mine roadway, Coal Science and Technology, 51, 1, (2023)