Fire-resistance design and experimental research for the stay cables of super-long span cable-stayed bridge

被引:0
|
作者
Shen, Kongjian [1 ,2 ,3 ]
Jiang, Zhenxiong [1 ]
Zhao, Jun [4 ]
Zhou, Zhubing [4 ]
Wu, Qiong [4 ]
Qiang, Qiang [4 ]
Wang, Hongchao [4 ]
机构
[1] Jiangsu Prov Transportat Engn Construct Bur, Nanjing 210004, Peoples R China
[2] China Railway Bridge & Tunnel Technol Co Ltd, Nanjing 210061, Jiangsu, Peoples R China
[3] Southeast Univ, Natl Key Lab Safety Durabil & Hlth Operat Long Spa, Nanjing 210096, Peoples R China
[4] Jiangsu Fasten Steel Cable Co Ltd, Jiangyin 214445, Peoples R China
来源
ADVANCES IN BRIDGE ENGINEERING | 2025年 / 6卷 / 01期
基金
国家重点研发计划;
关键词
Cable-stayed bridge; Stay cable; Fire-resistant performance; Structural system design; Fire resistance test;
D O I
10.1186/s43251-024-00153-1
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The cables are crucial to the service life of cable supported bridges. Fire accidents involving bridge cables may cause severe damage, impacting the structural integrity and performance of bridges, and therefore requires thorough attention and research. This research mainly focuses on the key technologies for the fire resistance of stay cables, including the structural system design of fire-resistant stay cables, selection of fireproof materials, and experimental verification of fire-resistant performance and qualification of the proposed system. The results show that the multiple wrapped composite structures with fire resistance are suitable for the fire-resistant design of stay cables in the Changtai Yangtze River Bridge. The fire-resistant structure of the stay cables is designed as one layer of flame barrier layer using 316L matte stainless steel, one layer of fire retardant layer using modified ceramic fiber cloth and two layers of insulation layer using aluminum foil glass fiber cloth. Moreover, the fire-resistant performance of the structural system is experimentally validated to meet the design requirements that the fire-resistant time of the stay cables should not be less than 60 min, and the temperature of the internal steel wire should not exceed 300 degrees C. Meanwhile, tensile testing under high temperature demonstrates that the designed stay cable can resist the applied load for 60 min under a high temperature of 300 degrees C at the surface of cable without slip or failure of anchorage components. The development of fireproof stay cable products, as applied in the Changtai Yangtze River Bridge project, provides a valuable reference for fire resistance design of bridge cables and contributes significant economic and social benefits.
引用
收藏
页数:22
相关论文
共 50 条
  • [1] Design and behavior of super-long span cable-stayed bridge with CFRP cables and UHPC members
    Ren, Liang
    Fang, Zhi
    Wan, Kai
    COMPOSITES PART B-ENGINEERING, 2019, 164 : 72 - 81
  • [2] Long-term monitoring of super-long stay cables on a cable-stayed bridge
    Shen, Xiang
    Ma, Ru-jin
    Ge, Chun-xi
    Hu, Xiao-hong
    WIND AND STRUCTURES, 2018, 27 (06) : 357 - 368
  • [3] Performances of super-long span prestressed cable-stayed bridge with CFRP cables and RPC girder
    Fang Zhi
    Fan Fenghong
    Ren Liang
    Engineering Sciences, 2013, 11 (05) : 70 - 76
  • [4] Approximate calculation of the static analysis of a lifted stay cable in super-long span cable-stayed bridges
    Zhao, Xinwei
    Xiao, Rucheng
    Sun, Bin
    STRUCTURAL ENGINEERING AND MECHANICS, 2020, 74 (05) : 635 - 655
  • [5] Research on parametric oscillation of cables for long span railway cable-stayed bridge
    Yang, Y.-Y., 1600, Editorial Department of Journal of Railway Engineering Society, China (30):
  • [6] Qualification of the Ernst formula for modeling the sag effect of super-long stay cables in the long-span railway cable-stayed bridges
    Wen, Ying
    Zhou, Zhiwei
    STRUCTURES, 2022, 45 : 99 - 109
  • [7] Research advancement of damping techniques for stay cables of long span cable-stayed bridges
    Wang, Zheng-Xing
    Wang, Bo
    Chai, Xiao-Peng
    Bridge Construction, 2015, 45 (03) : 13 - 19
  • [8] Seismic performance evaluation for super-long span cable-stayed bridges
    Ye Aijun1
    2.Jiangsu Provincial Sutong Bridge Construction Commanding Department
    EngineeringSciences, 2009, 7 (01) : 23 - 29
  • [9] Aerostatic response of a super long span cable-stayed bridge
    Department of Civil Engineering, NERIST, Nirjuli, Itanagar 791 109
    不详
    J Inst Eng India: Civ Eng Div, 2006, NOV. (3-7):
  • [10] Super-long-span bridge with cable-stayed bridge and suspension bridge
    Wang, HJ
    Shioi, Y
    Hasegawa, A
    STRUCTURAL ENGINEERING AND MECHANICS, VOLS 1 AND 2, 1999, : 1589 - 1594