Bivariate probabilistic slope stability analysis using copulas and back analysis by Markov chain Monte Carlo

被引:0
作者
Choubari, Reyhaneh Yousefnezhad [1 ]
Estalaki, Amir Malekpour [1 ]
Varaki, Mehdi Esmaeili [1 ]
机构
[1] Univ Guilan, Fac Agr Sci, Dept Water Engn, Rasht, Iran
关键词
GeoStudio; Landslide; Limit equilibrium; Metropolis; Reliability; GEOTECHNICAL RELIABILITY; SOIL SLOPE; SIMULATION; UNCERTAINTY; DEPENDENCE; RAINFALL; FAILURE; IMPACT; MODEL;
D O I
10.1007/s12145-025-01789-x
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Copula functions have been prevalently used to take into account the correlation of random variables in probabilistic analyses. In this paper, copula functions of different families were used in probabilistic slope stability analysis along with a back-analysis to reduce the uncertainty of random input variables. In this regard, the cohesion (c) and internal friction angle (& oslash;) of the soil were incorporated as random variables into a computer code developed in MATLAB. The c-& oslash; pair values generated using the best copulas were exported to GeoStudio software to estimate the distribution of the factor of safety (FS) by various limit equilibrium (LE) methods. Additionally, the Markov chain Monte Carlo (MCMC) method using Metropolis algorithm was employed to adjust the values of random input variables in a back analysis of slope stability, so as to modify the FS values. It was shown that the results of different copulas are affected by both the back analysis and c-& oslash; sample size, where the effect of back analysis on reducing the uncertainty is much more than increasing the sample size. Frank copula showed the strongest performance and the least uncertainty in probabilistic slope stability analysis, while Gaussian showed the weakest performance. Finally, it was found that the Morgenstern-Price, Spencer, and Bishop methods are the most effective LE methods for probabilistic slope stability analysis when the correlation of random variables are addressed.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] Markov Chain Monte Carlo Analysis of Trophic Cascade in Yellowstone after Reintroduction of Wolves
    Johnson, Darryl
    Klinke, David J.
    Wang, Qing
    Condon, Morgan
    Wang, Zhijun
    [J]. INTERDISCIPLINARY TOPICS IN APPLIED MATHEMATICS, MODELING AND COMPUTATIONAL SCIENCE, 2015, 117 : 253 - 258
  • [32] Bayesian Analysis of Pavement Maintenance Failure Probability with Markov Chain Monte Carlo Simulation
    Chen, Xueqin
    Dong, Qiao
    Gu, Xingyu
    Mao, Quan
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING PART B-PAVEMENTS, 2019, 145 (02):
  • [33] A Bayes analysis of modified Weibull distribution via Markov chain Monte Carlo simulation
    Upadhyay, S. K.
    Gupta, Ashutosh
    [J]. JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2010, 80 (03) : 241 - 254
  • [34] Stability Analysis of a Large Gold Mine Open-Pit Slope Using Advanced Probabilistic Method
    Pandit, Bhardwaj
    Tiwari, Gaurav
    Latha, Gali Madhavi
    Babu, G. L. Sivakumar
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2018, 51 (07) : 2153 - 2174
  • [35] Probabilistic slope stability analysis: The case study of a deposit slope in hydropower reservoir
    Yan Fei
    Lan Yucheng
    [J]. 2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 948 - 951
  • [36] Bayesian operational modal analysis and Markov chain Monte Carlo-based model updating of a factory building
    Lam, Heung-Fai
    Hu, Jun
    Yang, Jia-Hua
    [J]. ENGINEERING STRUCTURES, 2017, 132 : 314 - 336
  • [37] Probabilistic analysis of slope stability towards the slip
    Zeroual, Fatima
    Belabed, Lazhar
    [J]. ADVANCES IN INNOVATIVE MATERIALS AND APPLICATIONS, 2011, 324 : 400 - +
  • [38] Applying Probabilistic Methods for Slope Stability Analysis
    Huang, Jinsong
    [J]. GEOTECHNICAL LESSONS LEARNT-BUILDING AND TRANSPORT INFRASTRUCTURE PROJECTS, 2022 AGS SYDNEY ANNUAL SYMPOSIUM, 2024, 541 : 1 - 12
  • [39] Model choice using reversible jump Markov chain Monte Carlo
    Hastie, David I.
    Green, Peter J.
    [J]. STATISTICA NEERLANDICA, 2012, 66 (03) : 309 - 338
  • [40] Planning Tunnel Construction Using Markov Chain Monte Carlo (MCMC)
    Vargas, Juan P.
    Koppe, Jair C.
    Perez, Sebastian
    Hurtado, Juan P.
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015