The distributed flow shop scheduling problem with inter-factory transportation

被引:4
作者
Becker, Tristan [1 ]
Neufeld, Janis [2 ,3 ]
Buscher, Udo [2 ]
机构
[1] Tech Univ Dresden, Fac Business & Econ, Jr Professorship Management Sci, Dresden, Germany
[2] Tech Univ Dresden, Fac Business & Econ, Chair Ind Management, Dresden, Germany
[3] Otto von Guericke Univ, Chair Operat Management, Magdeburg, Germany
关键词
Scheduling; Distributed flow shop; Inter-factory transportation; Combinatorial optimization; Heuristic algorithms; ITERATED GREEDY ALGORITHM; PERMUTATION; MAKESPAN; SEARCH; OPTIMIZATION; HEURISTICS;
D O I
10.1016/j.ejor.2024.10.026
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Large manufacturing companies often manage a network of multiple factories, creating a distributed flow shop scheduling problem for flowline manufacturing processes. This problem involves assigning jobs to one of several distributed factories, each equipped with identical flow shops, and completing the jobs within their designated factory. We expand upon the traditional distributed flow shop scheduling problem by incorporating the transportation of intermediate goods between factories. This transportation can occur after each machine, with shipping times dependent on the distance between the origin and destination factories, potentially delaying further processing. Our objective is to minimize the makespan across all factories. We introduce an iterated greedy search procedure specifically designed for distributed flow shop scheduling with inter-factory transportation. Based on a graph representation, a speed-up procedure is developed to improve the algorithms search ability. Through computational studies, we demonstrate the effectiveness and efficiency of our proposed algorithm, and provide insights into the benefits of transportation. Our findings indicate that incorporating transportation enhances machine utilization across factories by alleviating bottlenecks, ultimately improving overall efficiency and reducing makespan. Besides, we are able to quantify the trade-off between transport times and the benefits of inter-factory transportation.
引用
收藏
页码:39 / 55
页数:17
相关论文
共 42 条
[1]   A novel chemical reaction optimization for the distributed permutation flowshop scheduling problem with makespan criterion [J].
Bargaoui, Hafewa ;
Driss, Olfa Belkahla ;
Ghedira, Khaled .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 111 :239-250
[2]   Multi-objective Optimization of the Distributed Permutation Flow Shop Scheduling Problem with Transportation and Eligibility Constraints [J].
Cai S. ;
Yang K. ;
Liu K. .
Journal of the Operations Research Society of China, 2018, 6 (03) :391-416
[3]  
Chandra R., 2001, Parallel Programming in Openmp
[4]   A collaborative optimization algorithm for energy-efficient multi-objective distributed no-idle flow-shop scheduling [J].
Chen, Jing-fang ;
Wang, Ling ;
Peng, Zhi-ping .
SWARM AND EVOLUTIONARY COMPUTATION, 2019, 50
[5]   A speed-up procedure for the hybrid flow shop scheduling problem [J].
Fernandez-Viagas, Victor .
EXPERT SYSTEMS WITH APPLICATIONS, 2022, 187
[6]   The distributed permutation flow shop to minimise the total flowtime [J].
Fernandez-Viagas, Victor ;
Perez-Gonzalez, Paz ;
Framinan, Jose M. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 118 :464-477
[7]   A bounded-search iterated greedy algorithm for the distributed permutation flowshop scheduling problem [J].
Fernandez-Viagas, Victor ;
Framinan, Jose M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) :1111-1123
[8]   Modelling and scheduling integration of distributed production and distribution problems via black widow optimization [J].
Fu, Yaping ;
Hou, Yushuang ;
Chen, Zhenghua ;
Pu, Xujin ;
Gao, Kaizhou ;
Sadollah, Ali .
SWARM AND EVOLUTIONARY COMPUTATION, 2022, 68
[9]  
Gao J., 2012, J COMPUT INF SYST, V8, P2025
[10]  
Gao J., 2011, Scientific Research and Essays, V6, P3094, DOI [10.5897/SRE10.1014, DOI 10.5897/SRE10.1014]