Determinants of road construction project delay in the case of Woliso-Ambo road construction

被引:0
作者
Berta, Kalkidan Kefale [1 ]
Tesfaye, Mesfin [1 ]
机构
[1] Ambo Univ, Sch Business & Econ, Dept Management, Woliso Campus, Woliso, Ethiopia
来源
SCIENTIFIC REPORTS | 2025年 / 15卷 / 01期
关键词
Material price escalation; Multiple regression analysis; Project delays; Project management; Road construction; COST ESCALATION;
D O I
10.1038/s41598-025-86852-9
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Despite delays, infrastructure development is crucial for socio-economic development and economic growth. Identifying and managing these delays increases project quality, reduces conflicts and risks, and ultimately contributes to overall development. This study summarizes the variables influencing the delay of the Woliso-Ambo Road construction project via multiple regression analysis and questionnaire surveys. With an emphasis on the Woliso-Ambo Road construction project, this paper sought to identify and examine several factors contributing to road construction delays. The data were collected from important project participants, such as project managers, engineers, contractors, and government representatives, via a questionnaire survey and unstructured interviews in addition to secondary documents. The associations between various parameters and project delays were then evaluated via multiple regression analysis of the data obtained from the questionnaire survey. The investigation considered several concerns, including escalation of material price influence, delays in the subcontractor work influence, material and equipment influence, inadequate management and supervision by consultants, and peace and security situations. The study findings showed that the Woliso-Ambo Road construction project had delays, mainly due to the increase in material price and material influence and equipment influence. The beta value of the regression reflects the direct relationship between the dependent and independent variables. The Multiple Regression model performed a strong R-value of 0.893 and an adjusted R-square of 0.797, indicating that the selected factors explained 79% of the variation in road construction delays. The results emphasize the importance of efficient planning and project management techniques to ensure the timely completion of road construction projects. The time overrun 97.4%, cost overrun 85.6%, financial loss 76.7%, company reputation 70.4%, poor quality of work 69.01%, contract relocation 65.7%, and poor quality 60.3% are the outcomes of the delays in the project areas. This study provides insightful information on the causes of delays in road construction projects and suggestions for improving project performance.
引用
收藏
页数:14
相关论文
共 51 条
  • [31] Challenges in developing the Ethiopian construction industry
    Mengistu, Desalegn Girma
    Mahesh, Gangadhar
    [J]. AFRICAN JOURNAL OF SCIENCE TECHNOLOGY INNOVATION & DEVELOPMENT, 2020, 12 (04) : 373 - 384
  • [32] Mirga Y., 2019, Perceived Causes of Project Implementation Delay in Road Construction Projects: A Case of Addis Ababa City Roads Authority
  • [33] Murray CJL, 2020, LANCET, V396, P1223, DOI [10.1016/S0140-6736(20)30752-2, 10.1016/S0140-6736(20)30925-9]
  • [34] COST ESCALATION, SCHEDULE OVERRUNS AND QUALITY SHORTFALLS ON CONSTRUCTION PROJECTS: THE CASE OF ZAMBIA
    Muya, Mundia
    Kaliba, Chabota
    Sichombo, Balimu
    Shakantu, Winston
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2013, 13 (01) : 53 - 68
  • [35] The role of Transport, IcT and Power Infrastructure in the ethiopian economy
    Nagy, Henrietta
    Abdulkadr, Ahmed Abduletif
    Neszmelyi, Gyoergy Ivan
    [J]. ECONOMY OF REGION, 2024, 20 (01) : 235 - 247
  • [36] Nazif A., 2021, Niger. J. Technol, V39, P1029, DOI [10.4314/njt.v39i4.8, DOI 10.4314/NJT.V39I4.8]
  • [37] Assessing the Causes of Time Overrun in Building and Road Construction Projects: The Case of Addis Ababa City, Ethiopia
    Negesa, Adamu Beyene
    [J]. JOURNAL OF ENGINEERING, 2022, 2022
  • [38] Nnadi E. O. E., 2017, Evaluation of Security Risk on Construction Project Cost in Nigeria, V03, P1
  • [39] Nuru S., 2019, The Oxford Handbook of the Ethiopian Economy, P190, DOI DOI 10.1093/OXFORDHB/9780198814986.013.1
  • [40] Causes of schedule delays in construction projects in Algeria
    Rachid, Zemra
    Toufik, Boudouh
    Mohammed, Baheddi
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (05) : 371 - 381