A BIM-based carbon footprinting of earthworks in road construction process

被引:1
作者
Lou, Baowen [1 ]
Rasmussen, Freja Nygaard [1 ]
Degago, Samson Abate [1 ,2 ]
Juvik, Eivind Schnell [2 ]
Bohne, Rolf Andre [1 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Civil & Environm Engn, Hogskoleringen 7A, N-7491 Trondheim, Trondelag, Norway
[2] Norwegian Publ Rd Adm, Sorgenfriveien 11, N-7031 Trondheim, Trondelag, Norway
关键词
Earthworks; Building Information Modelling; Carbon dioxide emission; Sustainability; Road construction; GREENHOUSE-GAS EMISSIONS; OPTIMIZATION SYSTEM; ON-SITE; SUSTAINABILITY; EQUIPMENT; DESIGN; MODEL;
D O I
10.1016/j.eiar.2024.107731
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Carbon dioxide emissions are a major component of greenhouse gases and their evaluation during the life cycle of civil infrastructures is increasingly becoming a pivotal criterion for project tendering. During construction activities, the use of heavy-duty vehicles generally accounts for most of the energy consumption. However, the CO2 emissions deriving from earthwork machines have not been thoroughly calculated yet due to the inner complexity of such task. In this regard, this research streamlines a quantitative assessment process of carbon dioxide leveraging digital tools and considering a bicycle lane project stretching approximately 3 km in Trondheim, Norway. Building Information Modelling (BIM) is adopted to define the necessary earthwork operations and provide accurate data to appraise quantity take-off volumes. Three earthwork tasks, namely excavation, transport and compaction, are investigated. The corresponding CO2 emissions are subsequently quantified considering three operating modes for excavator (idling, moving and working), three types of transport vehicles (wheel dozer, tractor scraper and articulated dump truck) and two models of compaction machines (sheepsfoot and vibratory rollers). The results indicate that 75.5 t CO2 emissions are generated from the on-site heavy machines. In particular, the transport activities contribute to the largest proportion of CO2 emissions (56 %), half of which is produced while moving excess soil to the dump pit. Besides, the amount of carbon dioxide (2.9 t) generated during the idling and moving statuses of excavator is not negligible. Therefore, an optimized construction workflow and proper planning process are required to reduce machine fuel consumptions as well as increase the working efficiency. Bearing in mind the strategic importance represented by early planning for sustainable construction activities, this study provides innovative insights regarding the assessment of carbon footprints generated by earthwork machines.
引用
收藏
页数:10
相关论文
共 50 条
  • [41] The Application of BIM-Based Technology toward Fall Hazard Mitigation in Construction
    Ajasa, Solomon Sesesie
    Marchiori, Raissa Seichi
    Song, Siyuan
    CONSTRUCTION RESEARCH CONGRESS 2024: HEALTH AND SAFETY, WORKFORCE, AND EDUCATION, 2024, : 538 - 547
  • [42] Trends in BIM-based plugins development for construction activities: a systematic review
    Saad, Ali
    Ajayi, Saheed O.
    Alaka, Hafiz A.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (16) : 2756 - 2768
  • [43] BIM-Based Safety Leading Indicators Measurement Tool for Construction Sites
    Haji, Mostafa Dadashi
    Behnam, Behrouz
    Sebt, Mohammad Hassan
    Ardeshir, Abdollah
    Katooziani, Ali
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2023, 21 (02) : 265 - 282
  • [44] BIM-Based Construction Information Management Framework for Site Information Management
    Lee, Dong-Gun
    Park, Ji-Young
    Song, Sang-Hoon
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [45] Collaboration in BIM-based construction networks: a qualitative model of influential factors
    Oraee, Mehran
    Hosseini, M. Reza
    Edwards, David
    Papadonikolaki, Eleni
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (03) : 1194 - 1217
  • [46] Approaches for BIM-based multi-objective optimization in construction scheduling
    Essam, Noha
    Khodeir, Laila
    Fathy, Fatma
    AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (06)
  • [47] Construction project stakeholders' perceptions and expectations of their roles in BIM-based collaboration
    Kiaulakis, Arvydas
    Vilutiene, Tatjana
    Sarka, Vaidotas
    Sarkiene, Edita
    13TH INTERNATIONAL CONFERENCE MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES (MBMST 2019), 2019, : 588 - 594
  • [48] Integrated BIM-Based LCA for the Entire Building Process Using an Existing Structure for Cost Estimation in the Swiss Context
    Naneva, Anita
    Bonanomi, Marcella
    Hollberg, Alexander
    Habert, Guillaume
    Hall, Daniel
    SUSTAINABILITY, 2020, 12 (09)
  • [49] BIM-based life cycle assessment and life cycle costing of an office building in Western Europe
    Santos, Ruben
    Costa, Antonio Aguiar
    Silvestre, Jose D.
    Vandenbergh, Thomas
    Pyl, Lincy
    BUILDING AND ENVIRONMENT, 2020, 169
  • [50] Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea
    Won, Jongsung
    Cheng, Jack C. P.
    Lee, Ghang
    WASTE MANAGEMENT, 2016, 49 : 170 - 180