A BIM-based carbon footprinting of earthworks in road construction process

被引:1
作者
Lou, Baowen [1 ]
Rasmussen, Freja Nygaard [1 ]
Degago, Samson Abate [1 ,2 ]
Juvik, Eivind Schnell [2 ]
Bohne, Rolf Andre [1 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Civil & Environm Engn, Hogskoleringen 7A, N-7491 Trondheim, Trondelag, Norway
[2] Norwegian Publ Rd Adm, Sorgenfriveien 11, N-7031 Trondheim, Trondelag, Norway
关键词
Earthworks; Building Information Modelling; Carbon dioxide emission; Sustainability; Road construction; GREENHOUSE-GAS EMISSIONS; OPTIMIZATION SYSTEM; ON-SITE; SUSTAINABILITY; EQUIPMENT; DESIGN; MODEL;
D O I
10.1016/j.eiar.2024.107731
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Carbon dioxide emissions are a major component of greenhouse gases and their evaluation during the life cycle of civil infrastructures is increasingly becoming a pivotal criterion for project tendering. During construction activities, the use of heavy-duty vehicles generally accounts for most of the energy consumption. However, the CO2 emissions deriving from earthwork machines have not been thoroughly calculated yet due to the inner complexity of such task. In this regard, this research streamlines a quantitative assessment process of carbon dioxide leveraging digital tools and considering a bicycle lane project stretching approximately 3 km in Trondheim, Norway. Building Information Modelling (BIM) is adopted to define the necessary earthwork operations and provide accurate data to appraise quantity take-off volumes. Three earthwork tasks, namely excavation, transport and compaction, are investigated. The corresponding CO2 emissions are subsequently quantified considering three operating modes for excavator (idling, moving and working), three types of transport vehicles (wheel dozer, tractor scraper and articulated dump truck) and two models of compaction machines (sheepsfoot and vibratory rollers). The results indicate that 75.5 t CO2 emissions are generated from the on-site heavy machines. In particular, the transport activities contribute to the largest proportion of CO2 emissions (56 %), half of which is produced while moving excess soil to the dump pit. Besides, the amount of carbon dioxide (2.9 t) generated during the idling and moving statuses of excavator is not negligible. Therefore, an optimized construction workflow and proper planning process are required to reduce machine fuel consumptions as well as increase the working efficiency. Bearing in mind the strategic importance represented by early planning for sustainable construction activities, this study provides innovative insights regarding the assessment of carbon footprints generated by earthwork machines.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] CONSTRUCTION 3D BIM-BASED KNOWLEDGE MANAGEMENT SYSTEM: A CASE STUDY
    Lin, Yu-Cheng
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (02) : 186 - 200
  • [32] BIM-Based Building Geometric Modeling and Automatic Generative Design for Sustainable Offsite Construction
    Gan, Vincent J. L.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (10)
  • [33] BIM-Based Life Cycle Assessment of Buildings-An Investigation of Industry Practice and Needs
    Zimmermann, Regitze Kjaer
    Bruhn, Simone
    Birgisdottir, Harpa
    SUSTAINABILITY, 2021, 13 (10)
  • [34] Multidisciplinary Approach to Agricultural Biomass Ash Usage for Earthworks in Road Construction
    Barisic, Ivana
    Grubesa, Ivanka Netinger
    Hackenberger, Davorka K.
    Palijan, Goran
    Glavi, Stella
    Trkmi, Marija
    MATERIALS, 2022, 15 (13)
  • [35] Research on carbon emissions during the construction process of prefabricated buildings based on BIM and LCA
    Ding, Yang
    Guo, Zhen-Zhen
    Zhou, Shuang-Xi
    Wei, Yong-Qi
    She, An-Ming
    Dong, Jing-Liang
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2025, 24 (03) : 1426 - 1438
  • [36] Integration of LCA and LCC analysis within a BIM-based environment
    Santos, Ruben
    Costa, Antonio Aguiar
    Silvestre, Jose D.
    Pyl, Lincy
    AUTOMATION IN CONSTRUCTION, 2019, 103 : 127 - 149
  • [37] BIM-based green building evaluation and optimization: A case study
    Guo, Kai
    Li, Qing
    Zhang, Limao
    Wu, Xianguo
    JOURNAL OF CLEANER PRODUCTION, 2021, 320
  • [38] BIM-based facilities information: streamlining the information exchange process
    Matarneh, Sandra
    Danso-Amoako, Mark
    Al-Bizri, Salam
    Gaterell, Mark
    Matarneh, Rana
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2019, 17 (06) : 1304 - 1322
  • [39] Development of a conceptual model for evaluating the success of BIM-based construction projects
    Olugboyega, Oluseye
    Edwards, David J.
    Windapo, Abimbola Olukemi
    Omopariola, Emmanuel Dele
    Martek, Igor
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2021, 10 (04) : 681 - 701
  • [40] Circular Economy and Virtual Reality in Advanced BIM-Based Prefabricated Construction
    O'Grady, Timothy M.
    Brajkovich, Nicholas
    Minunno, Roberto
    Chong, Heap-Yih
    Morrison, Gregory M.
    ENERGIES, 2021, 14 (13)