A BIM-based carbon footprinting of earthworks in road construction process

被引:1
作者
Lou, Baowen [1 ]
Rasmussen, Freja Nygaard [1 ]
Degago, Samson Abate [1 ,2 ]
Juvik, Eivind Schnell [2 ]
Bohne, Rolf Andre [1 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Civil & Environm Engn, Hogskoleringen 7A, N-7491 Trondheim, Trondelag, Norway
[2] Norwegian Publ Rd Adm, Sorgenfriveien 11, N-7031 Trondheim, Trondelag, Norway
关键词
Earthworks; Building Information Modelling; Carbon dioxide emission; Sustainability; Road construction; GREENHOUSE-GAS EMISSIONS; OPTIMIZATION SYSTEM; ON-SITE; SUSTAINABILITY; EQUIPMENT; DESIGN; MODEL;
D O I
10.1016/j.eiar.2024.107731
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Carbon dioxide emissions are a major component of greenhouse gases and their evaluation during the life cycle of civil infrastructures is increasingly becoming a pivotal criterion for project tendering. During construction activities, the use of heavy-duty vehicles generally accounts for most of the energy consumption. However, the CO2 emissions deriving from earthwork machines have not been thoroughly calculated yet due to the inner complexity of such task. In this regard, this research streamlines a quantitative assessment process of carbon dioxide leveraging digital tools and considering a bicycle lane project stretching approximately 3 km in Trondheim, Norway. Building Information Modelling (BIM) is adopted to define the necessary earthwork operations and provide accurate data to appraise quantity take-off volumes. Three earthwork tasks, namely excavation, transport and compaction, are investigated. The corresponding CO2 emissions are subsequently quantified considering three operating modes for excavator (idling, moving and working), three types of transport vehicles (wheel dozer, tractor scraper and articulated dump truck) and two models of compaction machines (sheepsfoot and vibratory rollers). The results indicate that 75.5 t CO2 emissions are generated from the on-site heavy machines. In particular, the transport activities contribute to the largest proportion of CO2 emissions (56 %), half of which is produced while moving excess soil to the dump pit. Besides, the amount of carbon dioxide (2.9 t) generated during the idling and moving statuses of excavator is not negligible. Therefore, an optimized construction workflow and proper planning process are required to reduce machine fuel consumptions as well as increase the working efficiency. Bearing in mind the strategic importance represented by early planning for sustainable construction activities, this study provides innovative insights regarding the assessment of carbon footprints generated by earthwork machines.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] Recent progress on BIM-based sustainable buildings: State of the art review
    Arenas, Nathalia Fonseca
    Shafique, Muhammad
    DEVELOPMENTS IN THE BUILT ENVIRONMENT, 2023, 15
  • [22] Collaborative Role of Sociotechnical Components in BIM-Based Construction Networks in Two Hospitals
    Merschbrock, Christoph
    Hosseini, M. Reza
    Martek, Igor
    Arashpour, Mehrdad
    Mignone, Gerard
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (04)
  • [23] Performance Analysis and Assessment of BIM-Based Construction Support with Priority Queuing Policy
    Ham, Nam-Hyuk
    Yuh, Ok-Kyung
    BUILDINGS, 2023, 13 (01)
  • [24] Critical review of bim-based LCA method to buildings
    Soust-Verdaguer, Bernardette
    Llatas, Carmen
    Garcia-Martinez, Antonio
    ENERGY AND BUILDINGS, 2017, 136 : 110 - 120
  • [25] Integrating BIM-Based LCA and Building Sustainability Assessment
    Carvalho, Jose Pedro
    Alecrim, Ismael
    Braganca, Luis
    Mateus, Ricardo
    SUSTAINABILITY, 2020, 12 (18)
  • [26] A BIM-Based Framework and Databank for Reusing Load-Bearing Structural Elements
    Bertin, Ingrid
    Mesnil, Romain
    Jaeger, Jean-Marc
    Feraille, Adelaide
    Le Roy, Robert
    SUSTAINABILITY, 2020, 12 (08)
  • [27] Contractual challenges for BIM-based construction projects: a systematic review
    Abd Jamil, Ahmad Huzaimi
    Fathi, Mohamad Syazli
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2018, 8 (04) : 372 - 385
  • [28] A BIM-based construction quality management model and its applications
    Chen, LiJuan
    Luo, Hanbin
    AUTOMATION IN CONSTRUCTION, 2014, 46 : 64 - 73
  • [29] Collaboration barriers in BIM-based construction networks: A conceptual model
    Oraee, Mehran
    Hosseini, M. Reza
    Edwards, David J.
    Li, Heng
    Papadonikolaki, Eleni
    Cao, Dongping
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2019, 37 (06) : 839 - 854
  • [30] Continuous BIM-based assessment of embodied environmental impacts throughout the design process
    Cavalliere, Carmine
    Habert, Guillaume
    Dell'Osso, Guido Raffaele
    Hollberg, Alexander
    JOURNAL OF CLEANER PRODUCTION, 2019, 211 : 941 - 952