Research on BIM-Based Visualization, Simulation, and Early Warning System for Shield Tunnel Construction

被引:0
|
作者
Cheng, Qian [1 ]
Wang, Xiangyu [2 ]
Sun, Junbo [3 ]
Zhao, Hongyu [1 ]
Liu, Xianda [2 ]
机构
[1] Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China
[2] East China Jiao Tong Univ, Sch Civil Engn & Architecture, Nanchang 330013, Peoples R China
[3] Curtin Univ, Sch Design & Built Environm, Perth, WA 6102, Australia
关键词
early warning simulation system; BIM; visual programming; shield construction; finite element analysis; dynamo;
D O I
10.3390/buildings15050746
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study aims to facilitate a comparison between construction monitoring data and simulation results, focusing on the dynamic adjustment of safety monitoring parameters in shield construction. First, a finite element simulation was performed to define a reasonable range for shield parameters based on settlement control values, thereby determining the theoretical settlement value. An early warning system was then developed integrating two key factors: theoretical and control settlement values. Finally, Dynamo was used to merge the digital and analog data, enhancing the visual representation of the monitoring information. The findings show that combining simulations with an early warning system effectively addresses the dynamic control challenges of shield construction parameters. Furthermore, integrating digital and analog monitoring significantly improves the efficiency of real-time visualization in monitoring data. This research provides a novel and effective methodology for enhancing shield tunnel construction safety, precision, and efficiency, offering critical insights for large-scale infrastructure projects and contributing to more reliable monitoring systems in complex construction environments.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Circular Economy and Virtual Reality in Advanced BIM-Based Prefabricated Construction
    O'Grady, Timothy M.
    Brajkovich, Nicholas
    Minunno, Roberto
    Chong, Heap-Yih
    Morrison, Gregory M.
    ENERGIES, 2021, 14 (13)
  • [42] Construction schedule early warning from the perspective of probability and visualization
    Yuan, Zhenmin
    Wang, Yaowu
    Sun, Chengshuang
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2017, 32 (01) : 877 - 888
  • [43] A BIM-based approach to reusing construction firm's management information
    Ma Zhiliang
    CONSTRUCTION ECONOMICS AND BUILDING, 2012, 12 (04): : 29 - 38
  • [44] PRELIMINARY CHECKLIST PROPOSAL FOR ENHANCING BIM-BASED CONSTRUCTION PROJECT CONTRACTS
    Erpay, Mehmet Yavuzhan
    Sertyesilisik, Begum
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2021, 26 : 341 - 365
  • [45] An integrated system for tunnel construction safety control based on BIM–IoT–PSO
    Hongren Jiang
    Annan Jiang
    Journal of Civil Structural Health Monitoring, 2024, 14 : 269 - 284
  • [46] A study on 3D/BIM-based on-site performance measurement system for building construction
    Cha, HeeSung
    Kim, Jun
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2020, 19 (06) : 574 - 585
  • [47] Research on BIM-based drawings query and feedback system with smart hand-held devices
    Luo Han-bin
    Xiong Chao-hua
    CREATIVE CONSTRUCTION CONFERENCE 2014, 2014, 85 : 351 - 357
  • [48] Component based engineering of a mobile BIM-based augmented reality system
    Meza, Sebastjan
    Turk, Ziga
    Dolenc, Matevz
    AUTOMATION IN CONSTRUCTION, 2014, 42 : 1 - 12
  • [49] BIM-based Virtual Reality and Human Behavior Simulation For Safety Design
    Park, Hyejin
    Panya, David Stephen
    Goo, Hyungmo
    Kim, Teahoon
    Seo, Jihyo
    COMPUTING FOR A BETTER TOMORROW, (ECAADE 2018), VOL 2, 2018, : 823 - 832
  • [50] Design and assembly workflow of universal segment of shield tunnel based on BIM
    Zhang, Jixun
    Zhang, Yuxian
    Ren, Xuhua
    Ma, Zichang
    Wang, Changsheng
    KSCE JOURNAL OF CIVIL ENGINEERING, 2025, 29 (04)