Research on BIM-Based Visualization, Simulation, and Early Warning System for Shield Tunnel Construction

被引:0
|
作者
Cheng, Qian [1 ]
Wang, Xiangyu [2 ]
Sun, Junbo [3 ]
Zhao, Hongyu [1 ]
Liu, Xianda [2 ]
机构
[1] Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China
[2] East China Jiao Tong Univ, Sch Civil Engn & Architecture, Nanchang 330013, Peoples R China
[3] Curtin Univ, Sch Design & Built Environm, Perth, WA 6102, Australia
关键词
early warning simulation system; BIM; visual programming; shield construction; finite element analysis; dynamo;
D O I
10.3390/buildings15050746
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study aims to facilitate a comparison between construction monitoring data and simulation results, focusing on the dynamic adjustment of safety monitoring parameters in shield construction. First, a finite element simulation was performed to define a reasonable range for shield parameters based on settlement control values, thereby determining the theoretical settlement value. An early warning system was then developed integrating two key factors: theoretical and control settlement values. Finally, Dynamo was used to merge the digital and analog data, enhancing the visual representation of the monitoring information. The findings show that combining simulations with an early warning system effectively addresses the dynamic control challenges of shield construction parameters. Furthermore, integrating digital and analog monitoring significantly improves the efficiency of real-time visualization in monitoring data. This research provides a novel and effective methodology for enhancing shield tunnel construction safety, precision, and efficiency, offering critical insights for large-scale infrastructure projects and contributing to more reliable monitoring systems in complex construction environments.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] A BIM-based visualization and warning system for fire rescue
    Chen, Xiu-Shan
    Liu, Chi-Chang
    Wu, I-Chen
    ADVANCED ENGINEERING INFORMATICS, 2018, 37 : 42 - 53
  • [2] Study on BIM-based construction project cost and schedule risk early warning
    Sun, Chengshuang
    Man, Qingpeng
    Wang, Yaowu
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 29 (02) : 469 - 477
  • [3] Preliminary study for performance analysis of BIM-based building construction simulation system
    Seok-heon Yun
    Ki-hyun Jun
    Chang-baek Son
    Sang-chul Kim
    KSCE Journal of Civil Engineering, 2014, 18 : 531 - 540
  • [4] Preliminary study for performance analysis of BIM-based building construction simulation system
    Yun, Seok-heon
    Jun, Ki-hyun
    Son, Chang-baek
    Kim, Sang-chul
    KSCE JOURNAL OF CIVIL ENGINEERING, 2014, 18 (02) : 531 - 540
  • [5] BIM-based structural health monitoring and early warning for heritage timber structures
    Wang, Juan
    You, Hongyu
    Qi, Xin
    Yang, Na
    AUTOMATION IN CONSTRUCTION, 2022, 144
  • [6] BIM-Based Automated Drainage System Design in Prefabrication Construction
    Zhang, Nan
    Tian, Yichen
    Wang, Jingwen
    Al-Hussein, Mohamed
    CONSTRUCTION RESEARCH CONGRESS 2020: COMPUTER APPLICATIONS, 2020, : 1146 - 1155
  • [7] BIM-based Collaborative Schedule Management System for the Construction Industry
    Hou, Xue-liang
    Lin, Zhi-ming
    2016 INTERNATIONAL CONFERENCE ON MANAGEMENT, ECONOMICS AND SOCIAL DEVELOPMENT (ICMESD 2016), 2016, : 957 - 962
  • [8] Framework for BIM-Based Simulation of Construction Operations Implemented in a Game Engine
    Osorio-Sandoval, Carlos A.
    Tizani, Walid
    Pereira, Estacio
    Ninic, Jelena
    Koch, Christian
    BUILDINGS, 2022, 12 (08)
  • [9] A BIM-Based Quality Inspection System Prototype for Temporary Construction Works
    Choi, Chang Hoon
    Lee, Junbok
    BUILDINGS, 2022, 12 (11)
  • [10] Integrated BIM-based modeling and simulation of segmental tunnel lining by means of isogeometric analysis
    Bui, Hoang-Giang
    Ninic, Jelena
    Koch, Christian
    Hackl, Klaus
    Meschke, Guenther
    FINITE ELEMENTS IN ANALYSIS AND DESIGN, 2024, 229